Similar Projects
Painting IDIQ
Term Contract
Design
$2,000 to $500,000 est. value
CA

VLS Painting and Marking
Term Contract
Design
Norco, CA 92860

Exterior Painting - Los Gatos DMV Field Office
Alteration
Post-Bid
Los Gatos, CA 95030

Interior and Exterior Painting, and Replacement of Cove Base
Alteration
Post-Bid
Santa Monica, CA 90404

Supply of General Construction Services
Demolition, Alteration
Results
Redwood City, CA 94063

La Crescenta East and West Reservoir Rehab and Coating Project
Renovation, Alteration
Results
$900,000 est. value
Glendale, CA 91214

Exterior Painting Services
Alteration
Post-Bid
Corte Madera, CA 94925

Interior Painting, Installation of Protective Wall Covering, and Replacement of Rubber Cove Base
Term Contract, Alteration
Results
$20,000 est. value
Indio, CA 92202

Tank 2 Re-Coating
Alteration
Post-Bid
Hemet, CA 92544

Interior Painting Services, Installation of Protective Wall Covering, and Replacement of Rubber Cove Base
Alteration
Results
$45,000 est. value
Riverside, CA 92506

CCC Placer Center Exterior Repainting Project
Alteration
Post-Bid
Auburn, CA 95602

Riverside County Law Library Paint and Carpet Project
Alteration
Results
$500,000 est. value
Indio, Riverside, CA 92201

Exterior Painting and Signage Replacement for the Carmichael DMV Field Office
Infrastructure, Alteration
Post-Bid
Carmichael, CA 95608

Wheeler Plaza Garage Painting Project
Alteration
Results
$100,000 to $150,000 est. value
San Carlos, CA 94070

Braford Avenue Pedestrian Bridge Painting
Renovation, Term Contract
Post-Bid
$125,000 est. value
Placentia, CA 92870

Last Updated 03/09/2023 05:12 PM
Project Title

Districtwide Painting Project, Area 1, 2, and 3 Middle Schools

Physical Address View project details and contacts
City, State (County) La Mesa, CA 91942   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall perform within the time stipulated the contract as herein defined, and shall provide all labor, materials, tools, utility services, and transportation to complete in a workmanlike manner all of the work required in connection with the following titled project. Makes all necessary repairs to all exterior decrepit to all surfaces that will be painted Mechanical Boxes-all exterior mechanical box cover on building. The work shall consist of furnishing all labor, materials and equipment required for the complete execution of all painting work specified herein, as described in the scope of work. Lead safe work practices. Work Included, Preparation of Surfaces, Lead Safe Work Practices, General Workmanship, Conduct of Operations, Protection, Touch up, and Clean up. Questions from Bidders Due (in writing) Tuesday, 2/21/2023 by 2:00 PM. Contract Term Start Date Date of NTP, provided after 3/7/2023. Contract Term Completion Date 100 days following. Liquidated Damages. If work under this contract is not ready for the intended use within the specified time period, the agreed liquidated damages established in Article 6 of the General Conditions is $500.00 per day, per school, for each calendar date completion is delayed.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents