Similar Projects
Main Street and San Juan Boulevard Intersection Upgarde - City of Farmington
Infrastructure
Conception
$250,000 CJ est. value
Farmington, NM 87401

Broadway and Butler Intersection Upgarde - City of Farmington
Infrastructure
Conception
$250,000 CJ est. value
Farmington, NM 87401

Blanco Flume Replacement
Infrastructure
Bidding
$650,000 CJ est. value
Bloomfield, NM 87413

Adult Detention Training and Wellness Center
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Farmington, NM 87401

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Hydro Excavation, Multi-Term Contract
Infrastructure
Results
Farmington, NM

Bergin Substation Rebuild - Civil Work
Infrastructure
Results
$660,000 est. value
Farmington, NM

Rehabilitate Taxiway A - Construction - City of Farmington
Infrastructure
Conception
$320,000 CJ est. value
Farmington, NM 87401

Roadway Rehabilitation
Infrastructure
Bidding
$600,000 CJ est. value
Bloomfield, NM 87413

Aztec Airport Improvements 2022 Runway 8-26 Lighting and Visual Aids
Infrastructure
Post-Bid
$400,000 CJ est. value
Aztec, NM 87410

Dine' College South Campus Fire Lane
Infrastructure
Results
$700,000 CJ est. value
Shiprock, NM 87420

Lake Farmington Outlet Piping (Tower Rehabilitation ) - City of Farmington
Infrastructure
Conception
$2,000,000 CJ est. value
Farmington, NM 87402

Agriculture MP Site Work Project
Infrastructure
Post-Bid
$563,000 CJ est. value
Shiprock, NM 87420

Engineering, Procurement and Construction for Bluffview Substation
New Construction, Infrastructure
Post-Bid
$17,323,590 CJ est. value
Farmington, NM 87401

Last Updated 10/28/2022 05:32 AM
Project Title

Lake Farmington - Rehabilitation Rip Rap on Dam - City of Farmington

Physical Address View project details and contacts
City, State (County) Farmington, NM 87402   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lake Farmington - Rehab Rip Rap on Dam. This project is in included in the City of Farmington FY 2023-2027 Capital Improvement Plan (CIP). As of October 28, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents