Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Biggs Road Resurfacing
Infrastructure
Bidding
LaGrange, OH 44050

Reconstruction of Linda Drive Phase 2
Infrastructure
Bidding
Lorain, OH 44053

S.R.83-South Avon Beldon Road Widening
Post-Bid
$228,650 est. value
Avon, OH

Paving Various Columbia Township Roads
Post-Bid
Columbia Station, OH

Street Patching within the City of Lorain
Results
Lorain, OH 44052

Grafton Chestnut Street Improvement Phase 2
Results
Less than $926,690 est. value
Grafton, OH 44044

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Ranger Way Extension
Results
$1,465,100 est. value
North Ridgeville, OH 44039

Penny Lane Resurfacing
Post-Bid
$62,850 est. value
LaGrange, OH

Two Lane Resurfacing - Findley State Park Main Road
Results
OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

2020 Asphalt Street Program
Results
Avon Lake, OH 44012

North Main Street and Sunrise Drive Area Improvements
Infrastructure
Post-Bid
Amherst, OH

Annual Chip and Seal Program Throughout the Township
Results
Wellington, OH 44090

Last Updated 06/23/2021 08:44 AM
Project Title

South Park and Grafton Street Pavement Improvements

Physical Address View project details and contacts
City, State (County) Oberlin, OH 44074   (Lorain County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $448,151
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Milling and resurfacing (intermediate & surface coarse, with paving fabric and pavement rejuvenator) of South Park St. (starting south of the E. Vine St. Intersection), south to Grafton St., and East on Grafton St. to the corporation limits. Replacement of 10 ADA Ramps, 2 Bike Path Aprons, and select curb and sidewalk sections. Thermoplastic crosswalks, bike crossing, and stop bars to be installed after pavement rejuvenator. Storm sewer scope includes replacing 6 catch basins and approximately 60 LF of 12? RCP, as well as replacing castings and risers on 2, existing to remain, catch basins.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents