Similar Projects
RFP Design - Construction of 3 Bridge Structures - 66th Street South East Railroad Overpass Project
Infrastructure
Conception
$700,000 CJ est. value
Bismarck, ND 58504

RFP Design - Construction of 3 Bridge Structures - 66th Street South East Railroad Overpass Project
Infrastructure
Conception
$700,000 CJ est. value
Bismarck, ND 58504

Bismarck Public Health Facility - Sitework
New Construction - 21,825 SF
Design
Bismarck, ND 58504

Meadow Village Apartments and Townhomes
New Construction, Infrastructure
Design
$62,000,000 CJ est. value
Lincoln, ND 58504

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Concrete Pavement Repair, Signals, Lighting, Turn Lane Improvements, Sidewalk, Storm Sewer, and Structure Repair
Infrastructure
Bidding
$11,500,000 CJ est. value
Bismarck, ND 58501

Military Parking Lot Surfacing - Aviation Readiness Center Complex
Infrastructure
Post-Bid
Bismarck, ND

Mandan High School BP-1 Earthwork
New Construction, Infrastructure
Post-Bid
Bismarck, ND

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Unit 5 - Igoe Park Parking Lot Replacement Improvement
Results
$138,000 to $184,000 est. value
Bismarck, ND 58503

Marquis Subdivision Self Storage
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Bismarck, ND 58504

Marquis Subdivision Self Storage
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Bismarck, ND 58504

RFP Engineering - Burnt Creek River Crossing Within 28th Street NW Project
Infrastructure
Conception
$200,000 CJ est. value
Hay Creek, ND 58503

Gravel Hauling for Township Roads
Term Contract
Post-Bid
Bismarck, ND 58501

Highway Concrete Pavement Repair
Results
$229,000 to $267,000 est. value
Bismarck, ND

Last Updated 12/07/2022 10:46 PM
Project Title

ADA Curb Ramps, Median Islands, Signal Improvements, Rrfb, Milling, Hot Mix Asphalt, Concrete Pavement, Sidewalks, Curb and Gutter, Aggregate Base Course

Physical Address View project details and contacts
City, State (County) Baldwin, ND 58521   (Burleigh County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $5,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Job23207 Proposed Work Consists of 4.7240 Miles of Ada Curb Ramps, Median Islands, Signal Improvements, Rrfb, Milling, Hot Mix Asphalt, Concrete Pavement, Sidewalks, Curb & Gutter, Aggregate Base Course Length: 4.7240 Located Nd 810 (Bismarck Expressway), W of Washington St E to Jct I-94b (Main Ave) Eb/wb - Bismarck And I-94b, Jct E Main Ave N to Near Rosser Ave - Bismarck And Nd 810 (Bismarck Expressway) - W of Washington St to E of 2nd St Eb/wb - Bismarck And Nd 810 (Bismarck Expressway), From 18th St E to 26th St - Bismarck Bid Range - $5,000,001 to $5,500,000 Prequalification is required for all bidders submitting a bidding proposal form. Prequalification is required annually. Prequalified contractors who wish to renew their prequalification must submit a complete "Contractor's Prequalification Statement" by July 1 of each calendar year. Bidders who are not currently prequalified must submit a complete "Contractor's Prequalification Statement" at least 10 business days prior to the date of the bid opening. Information is available from the Construction Services Division of the North Dakota Department of Transportation. Contractor's License--A contractor is not required to have a license from the state of North Dakota before bidding on any project, however, no contract will be awarded unless said contractor holds a current North Dakota license in the class within which the value of the contract falls. Contractors are required to meet the provisions of the Contract Work Hours and Safety Standards Act on the federal aid projects, are required to meet the Fair Labor Standards Act on all projects, and are required to pay any minimum wage rates set forth in the proposal form. A bid guarantee is required by Section 24-02-20, NDCC. The bid guarantee may be a bid bond equal to 10 percent of the full amount of the bid or a cashier's check of the bidder on a solvent bank equal to 5 percent of the bid. Bid bond shall be on the department form SFN 14196. Prior arrangements may be made with the department to file bid guarantees in advance. The Department of Transportation and all bidders are obligated to affirmatively ensure that in any contract entered into pursuant to this advertisement, minority or women's business enterprises will be afforded a full opportunity to participate and to submit bids in response to this invitation and will not be discriminated against on the grounds of race, religion, color, sex, age, or national origin in consideration for an award. Where applicable the contractor must fulfill all special provision requirements for utilization of Disadvantaged Business Enterprises. The right is reserved to reject any and all proposals, to waive technicalities, or to accept such as may be determined to be for the best interests of the state. NDDOT - Job No - 23207 - ADA Curb Ramps, Median Islands, Signal Improvements, Rrfb, Milling, Hot Mix Asphalt, Concrete Pavement, Sidewalks, Curb and Gutter, Aggregate Base Course *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. STATE FEDERAL AID PROJECT NOS. CVD-NHU-CPU-1-810(031)002 (PCN-23207), NHU-1-094(221)925 (PCN-23208), and SHE-1-810(032)002 (PCN-23225) and URBAN FEDERAL AID PROJECT NO. TAU-1-981(128) (PCN-23235) City Project HC-150

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents