Similar Projects
GAOA Lamoille Pavement Preservation Phase 2 Project for the Humboldt-Toiyabe National Forest
Alteration
Design
$250,000 to $500,000 est. value
Elko, NV

Woodbury Beltway Widening Craig Road to Grand Montecito Parkway and Various Safety Improvements
Infrastructure
Bidding
$23,906,624 to $26,423,110 est. value
Las Vegas, NV

Gowan Outfall Alexander Road
Infrastructure
Bidding
$34,000,000 to $36,000,000 est. value
North Las Vegas, NV

Maryland Parkway Bus Rapid Transit (BRT)
Post-Bid
$160,000,000 to $180,000,000 est. value
Las Vegas, NV

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Chip Seal
Results
$1,850,000 to $2,200,000 est. value

Chip Seal
Results
$1,850,000 to $2,200,000 est. value

Blue Diamond Wash - Arville Street to I-15
Infrastructure
Bidding
$5,679,266 to $6,277,084 est. value
Las Vegas, NV 89135

Lander County 2021 Preventative Maintenance Crackseal Project
Post-Bid
Battle Mountain, NV

Chip Seal with Fog Seal
Results
$1,550,000 to $1,850,000 est. value

Dean Martin Drive - Tompkins Avenue to Sammy Davis JR. Drive.
Infrastructure
Bidding
$4,022,098 to $4,445,476 est. value
Paradise, NV

NOAA Radar Site Access Road Maintenance
Post-Bid
NV

Slurry Seal
Results
$1,850,000 to $2,200,000 est. value
NV

Somersett 2022 Street Slurry Seal Preventative Maintenance Project
Alteration
Bidding
Reno, NV 89523

Blagg Road Overlay and Widening
Infrastructure
Post-Bid
Pahrump, NV 89060

Last Updated 04/06/2022 03:33 PM
Project Title

NV Flap 39(1) Kings Canyon Road

Physical Address View project details and contacts
City, State (County) Carson City, NV 89703   (Carson City County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Historically Underutilized Business (HUBZone) Set-Aside. This project consists of roadway reconstruction including widening, addition of aggregate base, and hot asphalt pavement and parking area construction along with drainage improvements along the route. Major items of work include: Schedule A Roadway Excavation: 25,000 CUYD Waste: 10,000 CUYD Roadway Aggregate: 5,500 TON Full Depth Reclamation: 1 MILE Asphalt Concrete Pavement: 3,200 TON 18-inch Pipe Culvert: 1,300 LNFT 6 Feet span, 4 feet rise Precast Concrete Box Culvert: 60 LNFT Curb, Concrete 12-inch Depth: 850 LNFT Sidewalk, Concrete: 360 SQYD

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents