Similar Projects
2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

19.56 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Full Depth Concrete Pavement Repairs, Joint Repairs and Pavement Markings
Results

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

2021 Butler Road Rehabilitation Program
Results
Rochester Hills, MI 48306

The Delaware
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Royal Oak, MI 48067

FPE Cip Paving 2021
Infrastructure
Post-Bid
Waterford Township, MI 48328

2021 Pavement Reconstruction
Results
Lathrup Village, MI

North Main Street Mixed-Use Building
Demolition, New Construction, Infrastructure - 31,680 SF
Pending Verification
$19,000,000 CJ est. value
Royal Oak, MI 48067

Road Repair - Hma Thermal Bond
Infrastructure
Post-Bid
MI

Woodward Heights Boulevard Resurfacing Project
Results
Hazel Park, MI 48030

Last Updated 09/19/2022 08:01 AM
Project Title

Pedestrian Bridges 27, 28 and 40 Replacement

Physical Address View project details and contacts
City, State (County) West Bloomfield, MI 48323   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replacment to Bridge 27, 28 & 40, three existing bridges in West Bloomfield township. Bonding Requirements - Bid Bond 5 % Questions are submitted online No

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents