Similar Projects
Microsoft Data Center / Palmetto
New Construction, Infrastructure, Alteration
Conception
$27,000,000 est. value
Palmetto, GA 30268

I-285/I-20 West Interchange Project
Design
Atlanta, GA 31175

State Route (SR) 400 Express Lanes P3 Project
Infrastructure
Bidding
$2,400,000,000 est. value
Atlanta, GA 31136

Ramp 2 Pavement Replacement
Infrastructure
Bidding
$200,000 est. value
Atlanta, GA

SR 400 Express Lanes
Post-Bid
Less than $13,000,000 est. value

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Asphalt Rejuvenation Project
Results
$66,430 est. value
Milton, GA 30004

T32-D7-Pavepres-SR 139 6-9-111011
Results
GA

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

Old Roswell Road at Warsaw Road Intersection Improvement
Infrastructure
Bidding
$2,000,000 est. value
Alpharetta, GA 30076

Creek Walk Connector Trail
New Construction
Post-Bid
GA 30324

Dunwoody Club Sidewalk
Results
Sandy Springs, GA

T32-D7-PCC-I85 I75 Split SB-119952
Infrastructure
Post-Bid
GA

Peachtree Dunwoody at Telford Place Roadway Improvement Project
Results
Sandy Springs, GA 30328

Last Updated 06/19/2022 11:09 PM
Project Title

Washington Road at Ale Circle Intersection

Physical Address View project details and contacts
City, State (County) East Point, GA 30344   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work for this project will consist of a realignment of Ale Circle that will tie into Washington road. Construction services will include roadway widening, asphalt milling and resurfacing, a 5' sidewalk, 24" curb and gutter, and guardrail installation along Washington road. The realignment of Ale Circle will incorporate a new roadway, 24" curb and gutter, asphalt milling, and excavation. All existing ramps shall be upgraded in compliance to ADA standards. Existing crosswalk enhancements shall also be included into this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents