Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

2022 Crack Filling
Infrastructure
Bidding
Bellevue, WI

Temporary Bypass Road Contract
Post-Bid
Less than $126,000 est. value
Hobart, WI 54155

Crackfilling
Post-Bid
De Pere, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Manitowoc - Green Bay, SCl - NCl
Results
Green Bay, Manitowoc, WI 54220

Alley Reconstruction
Infrastructure
Bidding
De Pere, WI

Green Isle Park Paving
Post-Bid
$300,000 est. value
Allouez, WI 54301

2021 Street and Utility Improvements Bohemia Drive, Hager Road, and Schleis Lane
Results
Denmark, WI 54208

2021 Road Construction
Post-Bid
De Pere, WI

2021 Resurfacing
Results
Green Bay, WI

Local Road Improvement
Post-Bid
WI

V. Bellevue, Manitowoc Road, Allouez Avenue - Kewaunee Road
Results
WI

2021 Road Improvement
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Last Updated 03/22/2022 12:12 PM
Project Title

Culvert Replacement and Hot Oil Chip Sealing

Physical Address View project details and contacts
City, State (County) WI   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Stone, Grind and Seal Coat 1.Meadow Drive a.1,795 feet by 18 feet. Add 4 inches of gravel (730 tons), pulverize 8-inch depth, grade, compact, apply a double hot oil chip seal coat. Sweep and vacuum excess stone. 2.Shady Lane Drive b.1,320 feet by 18 feet. Add 4 inches of gravel (540 tons), pulverize 8-inch depth, grade, compact apply a double hot oil chip seal coat. Sweep and vacuum excess stone. 3.Briar Drive c.1,850 feet by 16 feet. Add 4 inches of gravel (670 tons), pulverize 8-inch depth, grade, compact apply a double hot oil chip seal coat. Sweep and vacuum excess stone. 4.River Lane Drive d.530 feet by 16 feet. Add 4 inches of gravel (200 tons), pulverize 8-inch depth, grade, compact apply a double hot oil chip seal coat. Sweep and vacuum excess stone. Seal Coat with Spot Patching 1.Pine Ridge Court e. Cold mix asphalt wedging around north side of bulb. Wedging to fill potholes. Approximately 15 tons of cold mix asphalt. f. Single hot oil seal coat 1,270 feet x 20 feet. 2.Sumac Drive g. Cold mix asphalt pothole patching on south end. h. Single hot oil seal coat 1,270 feet x 22 feet. Includes cul-de-sac bulb with approximate 45-foot radius 3.Sandhill Drive (Redwood Drive to Pineview Drive) i. Cold mix asphalt pothole patching. j. Single hot oil seal coat 2,165 feet x 22 feet. Seal Coat 1.Angle Drive k. Single hot oil seal coat 900 feet x 20 feet (Town of Pittsfield) l. Single hot oil seal coat 10,600 feet x 20 feet (Town of Maple Grove) 2021 Specifications for Hot Oil Chip Seal Coating m. The seal coating will be done with a 340-degree 5% cutback ac blend asphalt and a 100% fractured washed chip. Both asphalt and aggregate will be applied full width in one pass. The finished seal coat will be rolled with a duo-packer roller. n. All driveways shall be cut back and transitioned to 7% maximum grade. o. All prices will include sweeping and or vacuuming of excess aggregate. p. Unit prices are to be given for culvert, gravel, pulverize and hot oil chip seal.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents