Similar Projects
Portland International Jetport Air Handling Unit Replacement
Alteration
Bidding
$450,000 est. value
Portland, ME 04102

Gignoux Courthouse HVAC and Fire Alarm Replacement - CMC Sources Sought Services
Term Contract
Bidding
Portland, ME 04101

HVAC Service
Term Contract
Post-Bid
Brunswick, ME 04011

Replacement of the Freezer/Cooler at Alfond Student Center
Post-Bid
Castine, ME 04420

SJC HVAC Upgrades at the Cumberland County Courthouse
Results
Less than $200,000 est. value
Portland, ME 04101

HVAC Repair Space Optimization & Renovation PNSY-B43
Renovation
Results
$1,000,000 to $5,000,000 est. value
Kittery, ME 03904

Edward T. Gignoux Federal Courthouse HVAC and Fire Alarm Upgrade
Post-Bid
$15,000,000 to $20,000,000 est. value
Portland, ME 04101

Vehicle Exhaust Removal Systems
Results
Rockport, ME

Venturi Hoods
Post-Bid
Kittery, ME 03904

8' x 20' Standard Modified ISO Container with Furnished Interior
Results
Kittery, ME 03904

Heat Pump Installation
Post-Bid
South Portland, ME

Building 34/39 HVAC Repair Project at the USPFO/Print Plant Building in the Camp Keyes Training Site
Results
Less than $1,900,000 est. value
Augusta, ME 04330

Boiler Service Agreement - Loring Job Corps Center
Post-Bid
Limestone, ME

Replacing the Fisher House HVAC Drain Pans
Results
Augusta, ME 30904

HVAC Construction
Post-Bid
Portland, ME

Reported 12/03/2021 12:00 AM
Project Title

NMCC Christie HVAC Renovation

Physical Address View project details and contacts
City, State (County) Presque Isle, ME 04769   (Aroostook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $650,000 to $750,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Removal of existing second floor exhaust system and gravity make up air ductwork. Existing hot water fan coil units and hot water baseboard to remain. Removal of existing ACT ceilings, and installation of new ACT tiles and grids at a lower elevation. Existing lighting shall be temporarily suspended and reinstalled. Installation of air-cooled heat recovery VRF system consisting of outdoor heat pump and a mix of indoor ducted and cassette evaporators. Heat pump shall be located on new structural frame built above the roof. VRF system shall serve all occupied spaces on the second floor. An indoor floor mounted energy recovery unit shall exhaust air from classrooms and bathrooms and temper ventilation air supplied to evaporators. Creation of a new mechanical room to house the new energy recovery unit including concrete curb and floor drains. Net project area is approximately 9,000 sq. ft.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents