Similar Projects
Titan Well Natural Gas Access Pad
Infrastructure
Conception
Murrysville, PA 15632

Z2da--693-20-109 Replace Underground Storage Tanks
Design
$1,000,000 to $5,000,000 est. value
Wilkes-Barre, PA 18702

KEHR Union Building (KUB) Gas Meter Relocation
Infrastructure
Bidding
Bloomsburg, PA

Fuel Tank Sump Replacements
Post-Bid
Pittsburgh, PA 15219

Water Treatment Chemicals for 2021
Post-Bid
Jersey Shore, PA 17740

Fuel Tank Farm 951 Permanent Closure Services, Naval Surface Warfare Center Philadelphia Division (NSWCPD), Philadelphia Navy Business Center (PNBC), Philadelphia, PA.
Results
Philadelphia, PA 19112

Fuel Tank Replacement Project
Results
$80,000 est. value
Kutztown, PA 19530

S222--Line Pumping and Grease Tank Cleaning
Post-Bid
Philadelphia, PA 19104

Chambersburg Natural Gas Pipeline Extension Phase 2 - Southwest Area Gas Main Extension
Results
Less than $438,106 est. value
Chambersburg, PA

H391--Fuel Maintenance And Polishing At Wilkes-Barre And Philadelphia Va Medical Centers
Post-Bid
Philadelphia, Pittsburgh, PA 19104

Micro Bulk Oxygen Tank, with Installation
Results
Coatesville, PA 19320

High School Oil Tank Replacement (Boiler Room C)
Post-Bid
Langhorne, PA 19047

J045--D/A Tank Isolation Valve Installation Coatesville VAMC
Results
Coatesville, PA 19320

CPI - Off-Road Fuel System
Renovation
Post-Bid
Pleasant Gap, PA 16823

3000 Gallon MOGAS AST, Dispenser and Appurtenances Demolition
Results
Chambersburg, PA

Last Updated 01/12/2022 12:55 PM
Project Title

Gas Holder - 11 Tank Draining

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Bucks County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The PGW Richmond Plant is currently an active liquefied natural gas (LNG) and natural gas processing facility located at 3100 East Venango Street in Philadelphia, Pennsylvania. PGW has taken Gas Holder #11 out of service in spring 2021. The water used as a gas seal contained in the holder must be removed and disposed of before demolition can begin.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents