Similar Projects
Screening Garage Odor Control Unit - City of Nashua
Renovation
Conception
$500,000 est. value
Nashua, NH 03060

Stormwater Site Improvements - City of Nashua
Infrastructure
Conception
$400,000 est. value
Nashua, NH 03060

Catch Basin Cleaning 2021
Term Contract
Post-Bid
Hollis, NH

2022 CIPP Lining
Infrastructure
Post-Bid
$1,600,000 est. value
Nashua, NH

S208--Storm Water Maintenance Services
Results
Manchester, NH 03104

Upgrading the Existing Secondary Clarifiers and Covers at the Milford Wastewater Treatment Facility (WWTF)
Results
Milford, NH 03055

Waste Water Treatment Facility Phase III Upgrade
Results
Less than $16,780,000 est. value
Merrimack, NH

2021 CIPP Lining Program
Results
Nashua, NH

CMOM Program - Phase III Sewer Rehabilitation and Repair Project - Contract 4
Results
Less than $5,100,000 est. value
Manchester, NH

Concrete Sewer and Drainage Structures
Term Contract
Results
Manchester, NH

Frames and Grates
Term Contract
Results
Manchester, NH

Lining Services for Sewer Siphon
Results
Less than $175,000 est. value
Hudson, NH

Louis Street Sewer Replacement Project - 2021 Sewer Project
Infrastructure
Results
Goffstown, NH 03102

Waste Line Replacement
Infrastructure
Results
Nashua, NH 03062

Sewer Lining Services for CSI Sewer Main
Infrastructure
Results
Hudson, NH

Reported 06/15/2022 02:54 PM
Project Title

Wastewater Infiltration And Inflow - City Of Nashua

Physical Address View project details and contacts
City, State (County) Nashua, NH 03060   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Sewage Treatment Plant, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Wastewater Infiltration And Inflow As of June 14, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents