Similar Projects
Last Updated | 08/26/2022 08:38 AM |
Project Title | Shingle and Gutter Replacement Natural Resource Conservation Service (NRCS) Washington Plant Materials Center Whitman County |
Physical Address | View project details and contacts |
City, State (County) | Pullman, WA 99163 (Whitman County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Roofing Shingles and Gutter Replacement on Buildings 195B and 195E, Washington Plant Materials Center, Pullman, Whitman County, WA Work consists of removing approximately 3,300 ft2 + 2,400 ft2 = 5700 square feet of asphalt shingles and tar paper underlayment on buildings 195B, and 195E and replacing with new underlayment, ice and water shield, flashing, and asphalt shingles. Removing approximately 350 linear feet of old gutters and down spouts from buildings 195B and 195E and replacing with new gutters, downspouts, and leaf/debris guards over the top of all gutters. A bid bond in the amount of 20% of the bid price is required to be submitted with bids. Bid and bid guarantees may only be submitted electronically due to COVID-19 restrictions. A formal bid opening will be held virtually; information is provided on page 41. A site showing will be held, the details are provided on page 38. Performance time is 30 calendar days after the Notice to Proceed is issued. Magnitude of construction: between $100,000.00 and $250,000.00 All questions should be provided in writing to Stephen Case, Contract Specialist, by email to: Stephen.case@usda.gov no later than Friday August 12,2022. Note: the bid due date time, 12:00 PM is Pacific Standard Time. Delivery: 30 Days After Notice to Proceed Delivery Location Code: NRCS-WA-PMC-PUL NRCS-PULLMAN PLANT MATERIAL CTR 4900 SE Terre View Dr. Bldg. 195A PULLMAN WA 99163 US 0001 WASHINGTON PLANT MATERIALS CENTER ROOFING SHINGLES AND GUTTER REPLACEMENT - BUILDINGS 195B AND 195E PULLMAN, WHITMAN COUNTY, WA PUBLIC BID OPENING PROCESS Public Bid Opening will be held via teleconference. To participate in the public bid opening process, participants can call Conference Call Number: (202) 650-0123, Conference ID 541 847 652# on the date and time (12:00PM Pacific Standard) set for public bid opening. DESCRIPTION/SPECIFICATIONS The project consists of removing approximately 3,300 ft2 + 2,400 ft2 = 5700 square feet of asphalt shingles and tar paper underlayment on buildings 195B, and 195E and replacing with new underlayment, ice and water shield, flashing, and asphalt shingles equivalent to Owens Corning TruDefinition Duration shingles, onyx black in color. And removing approximately 350 linear feet of old gutters and down spouts from buildings 195B and 195E and replacing with new gutters, downspouts, and leaf/debris guards over the top of all gutters. AGAR 452.211-72 Statement of Work/Specifications. (Feb 1998) The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J. (End of clause) AGAR 452.211-73 Attachments to Statement of Work/Specifications. (Feb 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract. Commencement, Prosecution, and Completion of Work. (Apr 1984) The Contractor shall be required to (a) commence work under this contract within (5) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than (30) days. The time stated for completion shall include final cleanup of the premises. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 30 Days After Notice to Proceed Goals for Minority Participation for Each Trade Goals for Female Participation for Each Trade 3.0% 6.9% |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |