Similar Projects
North Aud Block Infrastructure
New Construction
Conception
Buffalo, NY 14203

Maria Regina High School Ball Field
Renovation
Design
Hartsdale, NY 10530

Maria College Campus Development
Renovation, Addition - 1,120 SF
Design
$5,000,000 est. value
Albany, NY 12208

Rehabilitate Hungerford Hill Utility Infrastructure Phase 1
Renovation
Post-Bid
$400,000 est. value
Ithaca, NY 14853

Offsite Highway Improvements
Renovation
Post-Bid
Goshen, NY 10924

Gore Mt. Snowmaking - Reservoir Pumphouse - Foundation
Results
North Creek, NY 12853

Canal Square Park Site Improvements
Results
Cohoes, NY

Storm King Golf Club Entry
New Construction
Construction
Cornwall, NY 12518

Athenex Manufacturing Facility
Renovation
Construction
Dunkirk, NY 14048

Soccer Fields & Concession Facility
New Construction - 6,400 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Elma, NY 14059

Redwood Hill ADA Trail Improvements
Renovation
Post-Bid
$135,000 est. value
Redwood, NY 13679

Site Work for Rental Cottages at Westcott Beach State Park
Results
$885,000 est. value
Alexandria Bay, NY

Downtown Sports Center
New Construction - 26,400 SF
Construction
$6,600,000 est. value
Buffalo, NY 14210

Caroline Town Hall Site Improvements
Post-Bid
Slaterville Springs, NY

1847 Crompond Road Infrastructure Improvements
Results
$1,700,000 to $1,900,000 est. value
Peekskill, NY

Reported 04/08/2019 03:31 AM
Project Title

Administrative Offices and Lake George Battlefield Park Visitors Interpretive Center

Physical Address View project details and contacts
City, State (County) Lake George, NY 12845   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $600,000 to $700,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Removal and disposal of trees and stumps noted on the attached plans, at a nearby DEC property. Site grading and excavation Construction of a new concrete foundation for a new modular building. Modular Building to be obtained under a separate contract. Backfill, compaction, rough grading. Installation of stormwater control measures. Removal and disposal of approximately 210 feet of asbestos pipe wrap insulation and 15 feet of muddled asbestos insulation in existing building. Removal and disposal of 500 gallon existing fuel oil tank (empty). Demolition, removal and disposal of the existing office building. Installation of granite curbing, a new porous asphalt parking lot and striping. Installation of new sidewalks. Construction of new handicap walkway and stairs, and final site grading. Electrical hookups to the building. Other minor site and construction work as described in the specifications. This IFB does not include plants or planting of vegetation shown in the specifications.
Details
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Structure Demolition, Asbestos Remediation, Asbestos Abatement.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents