Similar Projects
West Campus Chilled Water Plant System Expansion (Design Assist-Mechnical)
Post-Bid
University Park, PA

Chilled Water Piping Installation in Walker Tunnel
Post-Bid
University Park, PA

Science Rooms Renovation - HVAC Construction
Results
$75,000 est. value
Philipsburg, PA 16866

Cooling Tower Replacement at Bellefonte Middle School
Results
Bellefonte, PA 16823

Walker Building HVAC Upgrades
Construction
University Park, PA 16802

HVAC and Mechanical Products
Term Contract
Post-Bid

Daikin Chiller Inspection/Maintenance/Repair
Term Contract
Results
Bellefonte, PA 16823

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Nature Inn - Moisture Remediation - Bald Eagle State Park
Results
$100,000 to $500,000 est. value
PA

Construction of a New 2,570 SQFT Interior Office Renovation - Mechanical Construction (Including HVAC and Plumbing)
Alteration
Post-Bid
Bellefonte, PA 16823

HVAC Work
Alteration
Results
State College, PA 16801

PSU - Grange Building HVAC Upgrades
Alteration
Post-Bid
State College, University Park, PA 16801

Stadium Improvement at the Penns Valley Stadium - HVAC Construction
Alteration
Results
Spring Mills, PA 16875

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

HVAC Work
Alteration
Results
State College, PA 16801

Last Updated 12/09/2021 08:38 AM
Project Title

HVAC Work

Physical Address View project details and contacts
City, State (County) State College, PA 16801   (Centre County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Boiler - Replace: 1. Install a new gas-fired wall hung Combi boiler to replace existing boiler and water heater in utility room. 2. Remove and dispose of existing gas-fired boiler, existing component to heat system (expansion tank, directional valve, fill/pressure reduction valve and auto vent) and gas water heater. 3. Boiler is to be a gas fired Energy Star Rated Combi boiler such as Navien NCB240E or approved equal. 4. Unit shall be size to accommodate a family of Four (4) easily. 5. New boiler shall be capable of heating all habitable rooms, including bath, to a temperature of 70 degrees F. between 6:00 AM and 11:30 PM and 65 degrees F. during all other hours. 6. Items to be included in replacement are all mechanical accessory necessary to complete the job for efficient operation, and to meet all code specifications. 7. Flush existing heat piping to clear of any debris to ensure proper function of the heat system. 8. Install an emergency shut-off switch at the entrance to the utility room. 9. Emergency switch must be located so as not to be confused as a light switch and have an “Emergency” cover plate. 10. Thermostat is to be replaced with new such as Honeywell or equal. 11. Replaced boiler, water heater and parts are to be removed from property. 12. Contractor is responsible for familiarizing homeowner with operation of all newly- installed components, supplying all literature and warranties. 13. Seal chimney closed at top and bottom.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents