Similar Projects
Towne Museum Exhibit Project
Renovation
Post-Bid
$5,800,000 CJ est. value
Kirksville, MO 63501

Hall of Waters Sat Grant Repair
Renovation
Post-Bid
Excelsior Springs, MO 64024

Art Museum Education Wing Replacement (AMMP Phase I) - 19-0050 - City of Springfield
Renovation
Conception
Less than $5,862,375 est. value
Springfield, MO 65807

Springfield Art Museum Archival Shelves
Renovation
Post-Bid
$145,000 CJ est. value
Springfield, MO 65807

WWI Gallery Refresh Phase 1 Stair Collections Center
Renovation - 10,000 SF
Post-Bid
$2,000,000 CJ est. value
Kansas City, MO 64108

Negro Leagues Baseball Museum Renovation / Kansas City
Renovation
Pending Verification
$1,000,000 CJ est. value
Kansas City, MO 64108

Laugh-O-Gram Studio Building Renovation / Kansas City
Renovation - 10,000 SF
Design
$2,000,000 CJ est. value
Kansas City, MO 64109

Replacing Windows, Doors, Sidewalks, Flooring, and Porch
Infrastructure, Renovation
Post-Bid
Pineville, MO 64856

JEFF 199879 - Old Courthouse Phase 2 Renovations, Gateway Arch National Park, Jefferson National Expansion
Renovation
Post-Bid
$10,000,000 CJ est. value
Saint Louis, MO 63102

The Saint Louis Art Museum - Sculpture Hall Remediation
Renovation - 2,000 SF
Post-Bid
$100,000 CJ est. value
Saint Louis, MO 63110

Missouri History Museum Plaza Entrance
Renovation
Pending Verification
$2,000,000 CJ est. value
Saint Louis, MO 63112

Jefferson Arms Renovation
Renovation
Post-Bid
$200,000 CJ est. value
Saint Louis, MO 63101

Last Updated 03/24/2023 05:23 PM
Project Title

Reroofing at Mark Twain Kindergarten Center A Building

Physical Address View project details and contacts
City, State (County) Poplar Bluff, MO 63901   (Butler County)
Category(s) Entertainment/Recreation
Sub-Category(s) Museum
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $127,750 [brand] Estimate
Plans Available from Agency's Affiliate - 01/12/23
Owner View project details and contacts
Architect View project details and contacts
Description

The Poplar Bluff R-1 School District wishes to secure sealed bids for the following projects: Installing metal stud- dryvitt system to replace windows at A Building at Mark Twain. Installing new Shingle roof on A building at Mark Twain. Reroofing at Mark Twain Kindergarten Center A Building BID SPECIFICATIONS 1. Remove guttering where necessary 2. Remove existing roofing material down to plywood deck. .3. Replace any warped or rotted plywood decking as needed. (Figure material and labor for decking replacement by the square ft. separately ) 4. Replace drip edge. 5. Cover decking with a 15 lb minimum felt. 6. Shingle roofwith a 30-year warranty, Malarkey brand architectural shake single or equal. 7. Install new pipe boots 8. Install new turbine vents 9. Install new facia where needed 10 . Reinstall and seal guttering 11. Clean up all trash from project.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents