Similar Projects
Last Updated | 03/24/2023 05:23 PM |
Project Title | Reroofing at Mark Twain Kindergarten Center A Building |
Physical Address | View project details and contacts |
City, State (County) | Poplar Bluff, MO 63901 (Butler County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Museum |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $127,750 [brand] Estimate |
Plans Available from | Agency's Affiliate - 01/12/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Poplar Bluff R-1 School District wishes to secure sealed bids for the following projects: Installing metal stud- dryvitt system to replace windows at A Building at Mark Twain. Installing new Shingle roof on A building at Mark Twain. Reroofing at Mark Twain Kindergarten Center A Building BID SPECIFICATIONS 1. Remove guttering where necessary 2. Remove existing roofing material down to plywood deck. .3. Replace any warped or rotted plywood decking as needed. (Figure material and labor for decking replacement by the square ft. separately ) 4. Replace drip edge. 5. Cover decking with a 15 lb minimum felt. 6. Shingle roofwith a 30-year warranty, Malarkey brand architectural shake single or equal. 7. Install new pipe boots 8. Install new turbine vents 9. Install new facia where needed 10 . Reinstall and seal guttering 11. Clean up all trash from project. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |