Similar Projects
O.B. Curtis Water Treatment Plant Membrane Filter System Train 5 Replacement
Renovation
Results
Jackson, MS

Nanofiltration Water Treatment Plant located in Gautier, Mississippi
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Gautier, MS

Starlanding Water System Improvements Phase II - Water Treatment Plant
New Construction
Post-Bid
MS

City of Grenada Water Treatment Facility Contract "B" Fort Hill Treatment Plant
Renovation
Post-Bid
Grenada, MS

Water Treatment Facility (Contract A)
Post-Bid
Grenada, MS

Facility Improvements Contract A - Weir Improvements
Renovation
Post-Bid
$1,300,000 est. value
Fulton, MS 38843

Engineering Services
Term Contract
Post-Bid
Philadelphia, MS

Reported 09/10/2021 12:00 AM
Project Title

Repair Wastewater Treatment Systems

Physical Address View project details and contacts
City, State (County) Flowood, MS 39232   (Rankin County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 172d Airlift Wing of Mississippi will award a single firm fixed price contract for Construction Services necessary to Repair Wastewater Treatment Systems, Project # LRXQ212503 for Mississippi Air National Guard 172nd Airlift Wing located in Flowood, MS. The requirement is for non-personal services to provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to Repair Wastewater Treatment Systems at Building 235 and Building 237. The Contractor shall provide all labor, materials, supervision, equipment, methods and devices necessary to repair the wastewater treatment systems for Bldg 235 & Bldg 237. This includes the removal of the existing wastewater treatment system at the Corrosion Control Hangar, Bldg 235, and installing a new oil/water separator (OWS) and pump. All components of the existing wastewater treatment system (inside, outside, above ground and below ground) will be removed. The concrete pavement and dike will be removed to allow removal of the below ground components. A new manhole will be installed at intersection of existing trench drain piping and a new 6 inch concrete slab will be installed inside the fenced area after all underground work is complete. Also included is the replacement of the existing OWS and installing a new OWS and pump at the Fuel Cell Hangar, Bldg 237.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents