Similar Projects
Construction Manager at Risk (CMAR) Services - Life Science / Physical Science Remodel and Building Additions - South Mountain Community College
Renovation, Addition
Results
$11,500,000 est. value
Phoenix, AZ 85040

Notre Dame Prep Performing Arts Theater f/k/a/ St. Catherine of Bologna Performing Arts Center
New Construction - 19,672 SF
Construction
$6,800,000 est. value
Scottsdale, AZ 85260

Tempe New Academic Building
New Construction - 143,000 SF
Results
Less than $58,000,000 est. value
Tempe, AZ

Mcccd Phoenix College Building A Remodel
Post-Bid
Phoenix, AZ 85013

Phoenix College Building-A Remodel
Renovation - 26,400 SF
Results
Less than $2,477,566 est. value
Phoenix, AZ 85013

Durham Hall
Renovation - 137,065 SF
Pending Verification
Tempe, AZ 85281

Estrella Mountain Community College - Komatke Hall Remodel, Phase I
Renovation
Post-Bid
$1,750,000 to $2,000,000 est. value
Avondale, AZ 85392

Rio Salado College Tower, 3rd Floor Remodel
Renovation
Post-Bid
$1,500,000 est. value
Tempe, AZ 85281

University Building 4th Floor Tenant Build-Out
Renovation, Infrastructure
Post-Bid
Gilbert, AZ 85233

University Building 4th Floor Tenant Build-Out
New Construction
Post-Bid
Gilbert, AZ 85233

General Construction for the Gorman Classroom Building Interior Renovation Project
Renovation
Results
Aguila, AZ

Tempe Campus Student Housing Renovations
Renovation
Conception
Tempe, AZ 85281

Tempe Campus Core Support Research Facility
New Construction
Conception
Tempe, AZ 85281

West Campus Student Housing Academic/Office Space
New Construction
Conception
Glendale, AZ 85306

Polytechnic Campus Student Union Expansion
Renovation, Addition - 65,000 SF
Conception
Mesa, AZ 85212

Last Updated 10/13/2021 09:14 AM
Project Title

Applied Research Building

Physical Address View project details and contacts
City, State (County) Phoenix, AZ   (Maricopa County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced June 2021, Construction Completion Expected December 2022
Bids Due View project details and contacts
Estimated Value Less than $33,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The new facility is envisioned to be an approximate 60,000 GSF multi-story building with a mix of space types including high bay areas, varying types of laboratories, clean rooms, faculty offices, conference rooms - both unclassified and sensitive. Facilities are anticipated to include cubesat fabrication/testing, advanced manufacturing, payload integration research, and cyber operations. Portions of the facility will require export control, secure communications capabilities, and other varying degrees of secure access.

Details

College/University, 60,000 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents