Similar Projects
Annual Parking Maintenance and Restoration 2021
Bidding
Lexington, KY

Beemon Lane Sidewalk/Conrad Lane Sidewalk/Idlewild Road Multi-Use Path
Bidding
Burlington, Florence, KY 41042

Removal and Replacement of Concrete Sidewalk Sections in Zone #2 - Various Street Locations
Post-Bid
Erlanger, KY

Deboard Terrace Construction Improvements
Post-Bid
Ashland, KY 41101

Fort Mitchell City Building Driveway Improvements and Brice Avenue Steps
Results
Less than $200,000 est. value
Fort Mitchell, KY

Main Street Sidewalk and Retaining Wall Construction
Results
Bromley, KY

Bond Forfeiture G III MAD 21
Bidding
$206,295 est. value
Frankfort, KY

Concrete Sidewalk and Driveway Replacement
Post-Bid
Versailles, KY

Concrete Restoration
Term Contract
Results
Less than $336,000 est. value
Erlanger, KY

Parking Lot and Sidewalk Upgrade
Bidding
$66,286 est. value
Corbin, KY

Louisville Hyundai Parking & Vehicle Display Expansion
New Construction
Post-Bid
Louisville, KY 40258

Curb/Sidewalk Repair & Reconstruction
Results
Newport, KY

Lakeside Drive Sidewalk Improvement
Bidding
Jenkins, KY 41537

West Pike Street Sidewalk Replacement 2021
Post-Bid
Covington, KY 41011

Southgate Community Center Trail Improvement Project
Results
$570,162 est. value
Southgate, KY 41071

Last Updated 02/05/2021 04:17 PM
Project Title

Main Street Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Bromley, KY   (Kenton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $153,813
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New sidewalk and lighting conduit along Main Street. SIDEWALK CONSTRUCTION New sidewalk to be constructed as depicted in plans on north side of Main Street between Boone Street and Moore Street. New sidewalk is also to be constructed on south side of Main Street between Moore Street and Highwater Road. Sidewalk on the south side of Main Street is to be removed and reconstructed between Kenton and Moore Street. SIDEWALK REPAIR Locations will be determined by City of Bromley representative in the field. These locations will include removal of existing sidewalk, regrading, forming and pouring of new sidewalk. The locations will be no less than 15 LF and includes transition from new sidewalk (5 feet wide) to existing sidewalk (4 feet wide). CONDUIT CONSTRUCTION Plan Sheets from Duke Energy show the locations of conduit to be placed for future lighting. Conduit should be placed in the utility strip between curb and sidewalk at depths identified on Duke Energy plans wherever possible. Restoration of any kind is incidental to the conduit bid item.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents