Similar Projects
2022/2023 Public Property Landscape Maintenance
Term Contract, Alteration
Bidding
Marengo, IL

Backflow Testing Services and Repairs
Term Contract
Bidding
Orland Park, IL

J0918 Air Conditioning Condenser Replacements
Term Contract
Post-Bid
Effingham, IL 62401

2020-2021 University District Parking Lot Snow Removal
Post-Bid
Champaign, IL

Chemical And Hazardous Waste Removal And Disposal
Term Contract
Results
Charleston, IL 61920

Elevator Upgrade and Fire Alarm Replacement
Renovation
Results
Chicago, IL 60612

Curbside Bagged Leaf Collection And Disposal Services
Alteration
Bidding
Urbana, IL

Traffic and Lighting Maintenance and Repair Agreement
Term Contract
Post-Bid
$45,000 to $100,000 est. value
Champaign, IL

Replace Passenger & Freight Elevators At Heating & Refrigeration Plant
Renovation
Results
Chicago, IL 60666

Tree Planting/Purchase For The City Of Urbana
Alteration
Bidding
Urbana, IL

Debris Dumping Transfer Station Services
Term Contract
Post-Bid
Chicago, IL

Miscellaneous Repairs at Metra Headquarters - 3 year contract
Renovation
Results
Less than $3,500,000 est. value
Chicago, IL 60661

Pest Control Services
Alteration
Bidding
Arlington Heights, IL

Snow Removal Services At South Region Scattered Sites
Post-Bid
Chicago, IL 60604

Chemical and Hazardous Waste Disposal
Results
Chicago, IL

Last Updated 02/10/2022 06:02 PM
Project Title

Downtown Power Washing of Sidewalks

Physical Address View project details and contacts
City, State (County) Bloomington, IL   (McLean County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Front Street (Both Sides); East Street (West Side); Main Street (Both Sides); Main Street (West Side); Center Street (Both Sides); Madison Street (East Side); Jefferson Street (Both Sides); Monroe Street (Both Sides); Washington Street (Both Sides); Market Street (Both Sides); Mulberry Street (Both Sides). The power washing of sidewalks will accomplish the following: • Removal of dirt and stains • Removal of human and animal waste stains • Removal offood waste stains • Removal of graffiti on sidewalks • Removal of gum and other substances/objects that may stick to sidewalk surfaces • Provide own source of water for the washing • Reclamation of all power wash water • Sidewalk shall be washed with high pressure washer (2,000 psi minimum) • Pressure washers shall be able to attain a minimum temperature of 160 degrees • Inlet grates shall be free from debris when completed • No mechanical cleaning devices shall be driven on the sidewalks • No harmful products should be used during power washing sidewalks as state by Federal, State, Regional and City of Bloomington storm water waste regulations.

Details

Division 02 - Existing Conditions, Physical Decontamination, Surface Cleaning Decontamination, High-Pressure Water Cleaning Decontamination.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents