Similar Projects
North Water Line Replacement Project
Infrastructure
Bidding
$325,000 est. value
Aspers, PA

Kane Glen Hazel Water Supply Main Replacement
Infrastructure
Bidding
$300,000 est. value
Pittsburgh, PA 15207

Resilient Seated Gate Valves
Post-Bid
Sewickley, PA

Wedge Action Mechanical Joint Restraint Systems
Post-Bid
Sewickley, PA

Forcemain Improvement Project
Results
PA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2022 Chestnut Street Roadway and Waterline Improvements
Infrastructure
Bidding
Coraopolis, PA 15108

Waterline Replacement Project for Sardis Road - Phase 1
Post-Bid
Pittsburgh, PA

Installation of 485` of 6" C900, DR14, PVC along Ruffner Lane
Results
Sewickley, PA 15143

Plastic Pipe
Post-Bid
Carnegie, PA

Polyvinyl Chloride Water Pipe (PVC)
Results
Sewickley, PA 15143

Wall Avenue Waterline Replacement
Post-Bid
Pittsburgh, PA

Water Valve Replacement Project
Results
Aliquippa, PA 15001

Megalugs for Ductile Iron with Gaskets
Post-Bid
Oakdale, PA

J045--Chilled Water Valve Replacement
Results
Pittsburgh, PA 15240

Last Updated 05/30/2022 07:59 AM
Project Title

Cold Water Meter Exchange

Physical Address View project details and contacts
City, State (County) Newport, PA   (Perry County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The work generally includes the removal of existing revenue water meters in the Owner’s system followed by the installation of a replacement meter to be provided by the Owner. Further, work will include scheduling of the work at individual meter locations, and performing standard plumbing work associated with installing/replacing any water appliance. Lastly, the work will include completing a data sheet, recording pertinent data about the work, such as: incoming service line size and material, condition of location of meter installation and it appropriateness, existence or absence of a manifold in the case of a duplex or multiple service location, condition of curb stop (functioning/not functioning).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents