Similar Projects
Blythe Island Regional Park Maintenance Barn
New Construction
Bidding
GA

Construction of Town Green
New Construction
Bidding
Monroe, GA

A New John H. Davis Recreation Center
Post-Bid
Dalton, GA 30721

C1--Tactical Training Tunnel
New Construction
Post-Bid
Savannah, GA

Construct Latrine Annex Building
New Construction, Addition
Results
$250,000 to $500,000 est. value
Fort Benning, GA 31905

Tear Out and Build in Burn Cells
New Construction, Demolition
Results
Brunswick, GA 31524

Savannah Arena
New Construction - 149,000 SF
Construction
$165,000,000 est. value
Savannah, GA

Robert S. Train Memorial Recreation Center Rehabilitation Project
Construction
Macon, GA 31202

Gwinnett Place Redevelopment Greenspace and Community Improvements
New Construction, Renovation
Pending Verification
Duluth, GA 30096

Sandy Creek Nature Center Visitor Center Restroom
Renovation
Bidding
GA

C1--Tactical Training Tunnel
New Construction
Post-Bid
Savannah, GA

Gordon Lee Hs Bleacher Replacement
Results
Chickamauga, GA

Lanierland Park Phase 2
New Construction - 5,025 SF
Construction
$16,500,000 est. value
Cumming, GA 30041

HVAC Gym Renovation and (3) New Outdoor Classroom Pavilions
New Construction, Alteration
Bidding
$600,000 est. value
Chickamauga, GA 30707

Pedestrian Information Kiosk at Mulberry River Walk
New Construction
Post-Bid
Braselton, GA

Last Updated 03/11/2022 05:03 AM
Project Title

Parks Hoke Park Covered Court and Restroom Pavilion

Physical Address View project details and contacts
City, State (County) Rome, GA 30161   (Floyd County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demo and remove existing Basketball courts. New Construction: Civil: Perform all civil work as required on Civil drawings. Slab: Provide slab and footing for new basketball court and pavilion per architectural drawings. Building: Construct new metal building frames and roofs per manufacturer Construct new CMU pavilion walls per architectural drawings. Wall Treatments: Paint all walls Ceilings: Ceilings open to roof – per architectural drawings Floors: Seal and Paint concrete. Paint basketball courts per park & rec dept. Electrical: Provide and install all electrical per Electrical drawings Plumbing: Provide and install all plumbing fixture and ADA fixture per Architectural and MEP drawings to include: Construction of three new ADA compliant restroom with one toilet & one lav and required Grab bars Construction of chase room with one janitor sink

Details

Misc. Recreational, New Construction, Restroom/Bath House, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents