Similar Projects
22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

9Th Avenue South East Improvements from 3rd Road Street to Railroad
Conception
$200,000 est. value
Cedar Rapids, IA 52407

420th St- PCC Overlay
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
IA

Various Locations - HMA Resurfacing with Milling
Infrastructure
Bidding
IA

HMA Resurfacing
Infrastructure
Post-Bid
IA

County Road Improvements
Infrastructure
Post-Bid
IA

Clover Lane Overlay
Results
Asbury, IA

8th Avenue South West from 15th Street South West to Rockford Road
Results
$3,220,000 est. value
Cedar Rapids, IA 52407

Ingleside Drive South West Pavement Improvements
Conception
$250,000 est. value
Cedar Rapids, IA 52404

U.S. 69 - HMA Joint and Crack Sealing
Infrastructure
Bidding
IA

Proposed Street Improvements - Middle Street and Prairie Street Paving
Infrastructure
Post-Bid
Mediapolis, IA 52637

First Ave West Pavement Rehabilitation and Traffic Signals
Results
$2,470,000 est. value
Cedar Rapids, IA 52407

32nd Street North East from Carlisle Street through Oakland Road Pavement Reconstruction
Conception
$2,000,000 est. value
Cedar Rapids, IA 52402

I-80 - PCC Patching
Infrastructure
Bidding
$500,000 est. value
IA

Eldridge SRF Water Quality Improvements - Permeable Pavement Alleyway
Infrastructure
Post-Bid
Eldridge, IA

Last Updated 04/19/2022 03:10 PM
Project Title

Triton Circle PCC Reconstruction

Physical Address View project details and contacts
City, State (County) Fort Dodge, IA 50501   (Webster County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $441,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The TRITON CIRCLE PCC RECONSTRUCTION PROJECT is located just northeast of the intersection of Highway 169 and Kenyon Road within the Iowa Central Community College Campus. The project consists of clearing and grubbing, approximately 225 CY of class 10 earthwork, 2,800 SY of subgrade preparation and modified subbase, miscellaneous utility adjustments, pavement and sidewalk removals, 2,410 SY of PCC pavement, 250 SY of PCC sidewalk, together with traffic control, pavement markings, seeding, erosion control, and related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents