Similar Projects
2,860 Linear Feet of 24' Ductile Iron Pipe
Post-Bid
Bessemer, AL

Installation of Water Mains and Appurtenances
Post-Bid
Birmingham, AL

25th Court NE Regulator Station
Results
Trussville, AL

John Owens Road and Venable Road PVC Main Replacement
Results
Trussville, AL

Curb Stops
Post-Bid
Birmingham, AL

Pine Hill Road Gas Main Replacement
Results
Trussville, AL 35173

Stockton Phase 10A Sector 2 Gas Main Extension
Post-Bid
Trussville, AL

Fire Hydrants (Annual)
Term Contract
Results
Birmingham, AL

Instantaneous Water Heater
Post-Bid
Birmingham, AL 35294

Gate Valves (Yearly)
Term Contract
Results
Birmingham, AL

Fuel Site Maintenance
Post-Bid
Birmingham, AL

Install Sampling Stations
Results
Birmingham, AL 35222

Dawson Avenue Southwest Main Replacement
Post-Bid
Birmingham, AL 35222

Mulga Water System
Results
Mulga, AL

5th Street Pratt City Main Replacement
Post-Bid
Birmingham, AL 35222

Reported 02/22/2019 12:00 AM
Project Title

Quadrant 1 Gas and Water Main Extensions Project

Physical Address View project details and contacts
City, State (County) Trussville, AL 35173   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work of Water Main Installation will be let under one contract, the principal items of work are as follows: 1. Installation of approx. 620 L.F. of 12" D.I. water main by open cut. 2. Installation of approx. 800 L.F. of 6" D.I. water main by open cut. 3. Installation of approx. 260 L.F. of 4" D.I. water main by open cut. 4. Installation of approx. 280 L.F. of 6" H.P. Stl. gas main by open cut. 5. Installation of approx. 950 L.F. of 2" PE gas main by open cut. 6. Installation of approx. 500 L.F. of 1" PE gas main by open cut. 7. Installation of water service lines, assorted fittings, and appurtenances. 8. Installation of connections to existing water main. 9. Installation of connections to existing gas main. 10. Furnish all labor, equipment and certain materials.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents