Similar Projects
Building 1176 Air Handler Unit Replacement (Naval Undersea Warfare Center, Newport, Rhode Island)
Term Contract
Design
$500,000 to $1,000,000 est. value
Newport, RI 02841

Construction - Installation of a New HVAC System
Alteration
Design
$25,000 to $100,000 est. value
Newport, RI 02841

Naval Academy Preparatory School Building 1372 Chiller Replacement
Alteration
Bidding
$250,000 to $500,000 est. value
Newport, RI 02841

HVAC Upgrades at Middletown High School and Aquidneck Elementary School
Post-Bid
Middletown, RI 02842

Construction - B1319 Air Conditioning Upgrade
New Construction
Post-Bid
$100,000 to $250,000 est. value
Newport, RI

Replacement of Air Control System for Police Station
Results
East Providence, RI 02914

Air Duct Cleaning
Results
Providence, RI

Construction - B1320 HVAC Retrofit
Post-Bid
$100,000 to $250,000 est. value
Newport, RI 02841

Andover Controls System Maintenance, Repairs and Parts
Term Contract
Results
Kingston, RI 02881

Elevator Ventilation Improvements City Hall
Post-Bid
Central Falls, RI 02863

Siemens Control System Maintenance, Repairs and Parts
Results
Kingston, RI

HVAC Maintenance
Term Contract, Alteration
Post-Bid
Jamestown, RI

HVAC for IT Department
Results
Providence, RI 02905

Westerly Middle School B-Pod Chiller Equipment Replacement
Alteration
Post-Bid
Westerly, RI 02891

Construction - Locker Room HVAC
Results
$25,000 to $100,000 est. value
Newport, RI 02841

Reported 04/05/2022 12:00 AM
Project Title

First Floor Classroom Air Conditioning Improvements

Physical Address View project details and contacts
City, State (County) North Kingstown, RI 02852   (Washington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work of this Contract is comprised of providing air conditioning improvements at the North Kingstown High School as follows: 1. Base Bid - Provide air conditioning (A/C) improvements throughout the classroom and art wing spaces as indicated in the Construction Documents (Drawings and Specifications). A. The contractor must provide all material, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature and all other services and facilities necessary to complete the construction for the Owner, including all incidental work as required or described in the contract documents. B. The selected Contractor shall be responsible for pre-ordering and storing all new interior and exterior equipment well prior to the start of construction scheduled for June 2022. The contractor shall include in their bid all costs associated with the storage of all equipment in a secure off-site facility and the delivery of the units to the site when the project is ready to receive the equipment to be installed in/on the existing building.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents