Similar Projects
Olympus Master Plan
New Construction - 861,283 SF
Conception
$10,000,000 CJ est. value
Clermont, FL 34711

Heartland Dental and Starbucks
New Construction
Conception
Minneola, FL

New Missions Volunteer Center
New Construction - 22,000 SF
Design
Eustis, FL 32736

Popeyes Louisiana Kitchen
New Construction - 2,146 SF
Design
Tavares, FL 32778

Scooter's Cafe
Renovation - 664 SF
Bidding
Eustis, FL 32726

Specialty Office at Four Corners
Build-Out - 957 SF
Bidding
Clermont, FL 34714

Beacon College Chopping Block Dining Hall
New Construction, Renovation - 6,200 SF
Post-Bid
Leesburg, FL 34748

Dunkin Donuts and Retail - Shell
New Construction - 4,819 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Leesburg, FL

Kingfisher Golf Maintenance Facility Fire Restoration
Results
The Villages, FL 32162

Redevelopment of City Owned Property
New Construction
Results
Mount Dora, FL

Florida Islamic Center
New Construction - 12,848 SF
Construction
$1,800,000 est. value
Clermont, FL 34711

Smoothie King
Renovation - 1,560 SF
Construction
$195,000 est. value
Clermont, FL 33825

Wolfbranch Meadows Professional Park
New Construction - 9,600 SF
Pending Verification
Sorrento, FL 32776

Hastings - Mixed-Use
New Construction - 20,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Sorrento, FL

Wellness Village
New Construction
Conception
$100,000,000 est. value
The Villages, FL

Last Updated 12/03/2021 12:14 PM
Project Title

First Baptist Church

Physical Address View project details and contacts
City, State (County) Umatilla, FL 32784   (Lake County)
Category(s) Commercial, Entertainment/Recreation, Religious/Funeral
Sub-Category(s) Food/Beverage Service, Misc. Recreational, Office, Religious Facility
Contracting Method
Project Status Permitting, Construction Start Expected December 2021, Construction Completion Expected October 2023, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1: 44,300 SF, consisting of a new construction Worship Center seating 1265 in theater seating, with additional classrooms and associated spaces. This is an addition to an existing facility that will be fully operational during the construction period. Phase 2: Renovation of an existing open one-story building with a footprint of approximately 7,100 SF of connector/gathering space into a new first floor multi-purpose space and addition of new second floor Children’s classrooms w/ construction of a new second floor within the existing building.

Details

51,400 SF - 1 Religious Facility, 44,300 SF New Construction, 1 Religious Facility, 7,100 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Walk-In Freezers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Bar Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Commercial Dishwashers, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Window Treatments, Casework, Specialty Casework, Religious Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Institutional Furniture, Classroom Furniture, Fixed Audience Seating, Pews and Benches, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents