Similar Projects
Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Culvert Replacement on IL 96
Infrastructure
Bidding
$800,000 CJ est. value
Quincy, IL 62301

Installing Riprap at SN 001-0008 Carrying IL 96
Infrastructure
Bidding
$500,000 CJ est. value
Quincy, IL 62305

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Drive and Parking Lot Replacement
Infrastructure, Alteration
Results
Golden, Mendon, IL 62339

Tar & Chip and Asphalt Milling & Resurfacing
Infrastructure
Results
$380,000 est. value
Quincy, IL 62301

Quincy Medical Group Hospital
New Construction, Infrastructure - 68,000 SF
Pending Verification
$61,142,058 CJ est. value
Quincy, IL 62301

Quincy Regional Airport - New Apron, Taxi Lane, and Road
New Construction, Infrastructure
Design
$2,400,000 CJ est. value
Quincy, IL 62305

Concrete Replacement Work at Indian Hills (IL 16-1)
Infrastructure
Post-Bid
$130,000 CJ est. value
Quincy, IL 62301

Spring Street and North 2nd Street Improvements
Infrastructure
Results
$1,827,160 est. value
Quincy, IL 62301

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Bridge Painting on SN 001-0013 Carrying IL 57 over Curtis Creek, 1.6 Miles South of US 24
Infrastructure
Results
Quincy, IL

Bituminous Surface Treatment
Infrastructure
Post-Bid
$400,000 est. value
Quincy, IL

Last Updated 07/07/2023 02:35 PM
Project Title

Van Buren Street - East of 24th Street

Physical Address View project details and contacts
City, State (County) Quincy, IL 62301   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $316,111 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Quincy's MR 673 Project consists of 298 tons of hot-mix-asphalt, installing 1197 feet of concrete & gutter, 116 sq yds of PCC driveways, 593 feet of 6" water main, storm sewers, and related improvements. All bids shall be accompanied by either a bid bond on the "Proposal Bid" form contained in the proposal, executed by a corporate surety company satisfactory to the city of Quincy, or a bank cashier's check, an irrevocable letter of credit or a properly certified check for not less than 5 percent of the amount bid, or for the amount listed in the specifications. The City Council of Quincy reserves the right to reject any or all bids and to waive technicalities. No bid may be withdrawn after the time for opening of the bids is past. The City of Quincy is an Equal Opportunity-Affirmative Action Employer and encourages minority group participation in the bidding and construction process. Bidders are notified that not less than the prevailing wage rate as determined by the Illinois Department of Labor shall be paid to all workers performing work under this contract.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents