Similar Projects
West Pipeline Road Improvements, Phase 3 from Lorean Branch to Harrison Lane
Infrastructure
Bidding
$3,800,000 est. value
Hurst, TX 76053

Burn Tower Foundation and Skills Pad Project
Infrastructure
Bidding
$3,250,000 est. value
Mansfield, TX 76063

FY2019 CIP Improvements Tumbleweed Trail Sewer, Water and Paving Replacement
Post-Bid
Less than $1,800,000 est. value
White Settlement, TX 76108

Asa Low Intermediate School Access Driveway
Post-Bid
$400,000 to $500,000 est. value
Mansfield, TX 76063

Southern Region Disaster Recovery Support BPA
Results

Annual Contract for Asphalt Street Repairs, Overlays, Materials and Street Maintenance Services
Term Contract
Results
Euless, TX 76039

Glade Road at Bluebonnet Drive Intersection Safety Improvements
Infrastructure
Bidding
$1,400,000 to $1,700,000 est. value
Colleyville, TX 76034

Somerset Phase 3 Paving Improvements
Post-Bid
Mansfield, TX 76063

McDonwell School Road at Westcoat Drive Roundabout
Results
Colleyville, TX 76034

Pothole Repair Services for Multiple Roadways and Shoulders
Infrastructure
Bidding
Fort Worth, TX 76133

North Tarrant Pkwy & Lakeview Dr Road Construction
Post-Bid
Keller, TX 76248

Colleyville John McCain Road at Westcoat Drive Intersection Improvements
Results
Colleyville, TX 76034

Holland Road - Phase 2 Paving, Drainage, and Sanitary Sewer Improvements
Infrastructure
Bidding
$10,081,589 est. value
Mansfield, TX 76063

Harmon Road Improvements
Post-Bid
Fort Worth, TX

Paving Replacement
Results
River Oaks, TX 76114

Last Updated 10/12/2021 11:31 AM
Project Title

Bear Creek Parkway Intersection Improvements

Physical Address View project details and contacts
City, State (County) Keller, TX 76248   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of: 1. Reconstruction the existing intersection into a single lane roundabout 2. Sidewalks, curb ramps, and combination railing installation 3. Landscaping and irrigation in the central island and medians 4. Water line lowerings 5. Drainage improvements including: a. installation of curb inlets, drop inlets, 18 inch reinforced concrete pipe, and 24 inch reinforced concrete pipe b. extending the existing culvert south of Bear Creek Parkway and installing a new headwall

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents