Similar Projects
Last Updated | 08/28/2019 08:50 AM |
Project Title | Barton Lab - AHU HV-2 Replacement |
Physical Address | View project details and contacts |
City, State (County) | Geneva, NY 14456 (Ontario County) |
Category(s) | Laboratory, Single Trades |
Sub-Category(s) | Laboratory, Mechanical |
Contracting Method | Bids by Invitation. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $80,000 to $100,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Disconnect and remove the air handling unit (AHU) HV-2 on the ground floor and the associated DX cooling condensing unit on the roof in Barton Lab, at Cornell AgriTech on the Geneva Campus. (15 Castle Creek Drive) Patch EPDM roofing. Provide and install new replacement air handling unit in the same location. New unit to utilize existing hot glycol for heating coil, and existing chilled glycol for cooling coil. Tap into building chilled water loop and run piping from next room. Connect the new AHU with existing zone ductwork in fan room. Provide and install dampers and flow stations in each zone as specified. | ||
Details | Laboratory, Renovation.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |