Similar Projects
Football Stadium Parking Expansion
Infrastructure
Conception
$4,700,000 est. value
Paradise, CA 95969

2025 Road Rehabilitation - 50494 - City of Chico
Infrastructure
Conception
$2,700,000 est. value
Chico, CA 95928

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Oroville Veterans Memorial Park (OVMP ) Shade Structure
Infrastructure
Design
$228,000 CJ est. value
Oroville, CA 95965

Public Health Storage Building Procurement and Construction Project
New Construction, Infrastructure - 3,000 SF
Bidding
$1,144,306 CJ est. value
Oroville, CA 95965

Middle Field Sod Replacement at Paradise High School
Infrastructure
Bidding
$260,000 CJ est. value
Paradise, CA 95969

Construct Retaining Wall, Culvert and Place HMA
Infrastructure
Post-Bid
$13,600,000 est. value
Butte Valley, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Import Borrow, Jack Welded and Corrugated Steel Pipe
Infrastructure
Results
$1,730,000 est. value
CA

Gold Flat Campground Upgrades
Renovation
Results
$700,000 to $1,100,000 est. value
Oroville, CA 95966

Bruce Village Commons
New Construction, Infrastructure
Pending Verification
$18,500,000 CJ est. value
Chico, CA 95928

2027 Road Rehabilitation - 50560 - City of Chico
Infrastructure
Conception
Chico, CA

Install Lighting, Widen Shoulders, Upgrade End Treatments at Bridge Approaches, and Rehabilitate Culverts
Infrastructure
Design
$17,100,000 est. value
Chico, CA 95928

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Replace Culverts and Install Cured-In-Place Pipeliners
Infrastructure
Results
$520,000 est. value
Butte Valley, CA

Last Updated 08/18/2022 01:36 PM
Project Title

Bald Rock Road Rehabilitation

Physical Address View project details and contacts
City, State (County) Berry Creek, CA 95916   (Butte County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work, in general, to be done under this contract consists of, but is not limited to: clearing and grubbing; traffic control; removal and replacement of existing storm drain pipes; ditch and culvert rehabilitation; pulverization of existing asphalt concrete; full depth reclamation with cement; hot mix asphalt paving; removal and replacement of AC dike; and placing thermoplastic striping and markings. All work shall include furnishing all labor, tools, materials, equipment, supplies, incidentals, and manufactured articles necessary to complete the project as shown on the plans, as described in the Special Provisions, or as directed by the Engineer. All in conformance with the State of California, Department of Transportation 2018 Standard Specification and Standard Plans, Butte County Standard Details, and these Special Provisions. All questions must be submitted via electronically, no questions will be accepted after August 11, 2022 4:00pm All Proposal PF pages contained within the project Specifications booklet must be included in the bid submittal. The successful bidder shall furnish a payment bond and a performance bond. No Pre-bid meeting is scheduled for this project. Contract items of work and quantities thereof for which payment will be made under this contract are contained in the proposal. The items of work and quantities are given as a basis for the comparison of bids and the County of Butte does not, expressly or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work, or to omit portions of the work, as may be deemed necessary or advisable by the Engineer Each proposal must be accompanied by a Bidder's Security of at least ten-percent (10%) of the total amount bid. The Security may be in the form of a Bidder's Bond, a certified check or a cashier's check payable to the County of Butte. State Prevailing Wages are required on this contract. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and prevailing wage rates determined by the Department of Industrial Relations for similar classifications of labor, the Contractor and his subcontractors shall pay no less than the higher wage rate. This includes "helper" (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question. The County of Butte reserves the right to reject any or all bids and to waive any informality in any bid.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents