Similar Projects
Palm Coast Library Driveway and Parking - Flagler County
Infrastructure
Conception
$435,000 CJ est. value
Palm Coast, FL 32137

SR 100 from N. Palmetto ST to Old Kings Rd South - Florida Department of Transportation
Infrastructure
Conception
$9,500,000 CJ est. value
Bunnell, FL 32110

Secure Space Self Storage
New Construction, Infrastructure - 31,500 SF
Design
$3,400,000 CJ est. value
Palm Coast, FL 32137

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Flagler Palm Coast National Guard Vehicle Maintenance Shop
New Construction, Infrastructure - 31,631 SF
Bidding
$12,500,000 CJ est. value
Palm Coast, FL 32164

Long Creek Nature Preserve - Phase 2
Infrastructure
Bidding
$200,000 CJ est. value
Palm Coast, FL 32137

Hargrove Grade Road Reconstruction - Flagler County
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bunnell, FL 32110

Hargrove Grade Road Reconstruction - Flagler County
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bunnell, FL 32110

London Waterway Expansion
Infrastructure
Results
$8,972,745 CJ est. value
Palm Coast, FL 32137

London Waterway Expansion
Infrastructure
Results
$8,972,745 CJ est. value
Palm Coast, FL 32137

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Par Builders Storage
New Construction, Infrastructure - 103,255 SF
Pending Verification
$11,000,000 CJ est. value
Bunnell, FL 32110

Flagler Gun and Archery Club Warehouse
New Construction, Infrastructure - 3,600 SF
Pending Verification
$400,000 CJ est. value
Bunnell, FL 32110

Old Haw Creek Road from County Road 304 to SR 100 - Construction - Flagler County
Infrastructure
Conception
$7,788,650 CJ est. value
Bunnell, FL 32110

Plantation Bay Section 2A-F Unit 16
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Bunnell, FL 32110

Last Updated 09/17/2023 11:32 PM
Project Title

Indian Trails Reclaimed Water Main Extension and Control System

Physical Address View project details and contacts
City, State (County) Palm Coast, FL 32137   (Flagler County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,030,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF SERVICES: The City of Palm Coast is seeking proposals from qualified Contractors. The project shallconsist of the construction of over 6,100-ft of new 4-12 reclaimed / non-potable water main along a portion ofthe Citys dirt recreational trail. Construction will include a new irrigation pump station, connecting new mains tothe existing irrigation pipeline, and reconfiguring piping and installing new bladder tanks and backflow preventersat four existing irrigation wells. Electrical and instrumentation construction will include a new pond level control fillvalve, pond level measurement, instrumentation at the Citys WWTP and adding electrical actuators to two existing above grade 16 valves. CONTRACT TIME: Total construction time to achieve Substantial Completion for the Project is three hundred andsixty-five (365) consecutive calendar days from the date of the Notice to Proceed, with an additional sixty (60)consecutive calendar days to achieve Final Completion. Bid submittals shall bereceived electronically through the Citys Procurement Portal by the specified time and date. No other method ofsubmission will be allowed or considered (i.e. mailed, emailed, or hand delivered). CONTACT: All prospective Bidders are hereby instructed not to contact any member of the City of Palm CoastCity Council, City Manager, or City of Palm Coast staff members other than the noted contact person(s) regardingthis bid/request at any time prior to the bid/request having been formally presented to, and voted on by, the CityCouncil. Any such contact shall be cause for rejection of your bid/request submittal. QUESTIONS: Any questions concerning the intent, meaning and interpretations of the bid documents includingthe draft agreement, shall be requested in writing through the Citys Procurement Portal Web Page at least seven (7) calendar days prior to the due date. ADDENDA: Should revisions to the bid documents become necessary; the City shall post addenda information onthe Citys Procurement Portal Web Page All Biddersshould checkthe Citys Procurement Portal Web Page at least three (3) calendar days before the date fixed to verifyinformation regarding Addenda. Bidder shall sign, date, and return all addenda with their bid submittal. Failure todo so shall result in rejection of the bid submittal as unresponsive. BID SECURITY/BID BOND: A Bid Bond shall accompany each Bid if the Bid amount is one-hundred thousanddollars ($100,000) or greater. The Bid Bond shall be for an amount not less than five percent (5%) of the Bid priceand shall be made payable to the City as a guarantee that the Bidder will not withdraw his/her Bid for a period ofone hundred twenty (120) days after the Bid closing time. PERFORMANCE, PAYMENT, & MATERIAL AND WORKMANSHIP BONDS: In the event the Contract is awarded tothe Successful Bidder and will enter into a written Agreement with the City and furnish a Payment Bond andPerformance Bond in an amount equal to the Contract Price. The Material and Workmanship Bond shall be in anamount equal to ten percent (10%) of the Contract Price as adjusted on the Final Application for Payment. TheBidder will forfeit their Bid Security if they fail to do so. All Bonds shall be secured from or countersigned by anagency or surety company recognized in good standing and authorized to do business in the State of Florida. AWARD OF CONTRACT: All submittals will be evaluated by City staff in accordance with the criteria set forth inthe bid documents. The City reserves the right to reject all bids/submittals, and to solicit and re-advertise fornew bids, or to abandon the project in its entirety at any time during the process including, but not limited to,after the Notice of Intent to Award.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents