Similar Projects
RFP - Property Management and Maintenance
Term Contract
Conception
Bloomington, MN 55431

RFP Design - 2022 Campus Elevator Modernization PreDesign Study
Renovation
Bidding
$900,000 CJ est. value
Minneapolis, MN 55415

Construction Coordinator Services
Term Contract
Sub-Bidding
Minneapolis, MN 55415

Cleaning and Snow Removal Services at Marquette and 2nd
Term Contract
Sub-Bidding
Minneapolis, MN 55415

Tree Maintenance Equipment, Attachments, and Accessories
Term Contract
Post-Bid

Repair Parts, Access, Brooms, Labor Elgin Sweepers
Term Contract
Post-Bid
$50,000 to $75,000 est. value

MCTC - Construction Manager
Renovation
Results
$13,812,000 est. value
Minneapolis, MN 55414

717 Delaware - Smoking Research
Renovation
Results
Minneapolis, MN 55455

Rasmussen University Higher Education Building
New Construction - 20,763 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Brooklyn Park, MN 55444

Furnish And Delivery Of Snow Fencing Materials
Term Contract
Post-Bid

Furnish and Install In-Floor Brake Testers at MSP
Term Contract
Results

Pest Management Services with Related Products
Post-Bid

Waste (MSW) and Organics (SSO) Removal SVCS
Term Contract
Results
MN

Conservation Improvement Program
Term Contract
Post-Bid

Andersen Library - Bell Period Room Relocation
Renovation
Results
$515,000 est. value
Minneapolis, MN 55455

Last Updated 08/01/2022 03:06 PM
Project Title

Audio Visual Equipment and Supplies

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55415   (Hennepin County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Request for Proposal for a University-wide Contract for Audio Visual Equipment and Supplies. Before submitting questions about the RFP via the Questions Tab, read and review the Supplier Process and Information Attachment and ALL Attributes in the Attributes Tab, especially Background and Project Summary/Scope of Work.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents