Similar Projects
Benson - Douglas Highway - SR 80 (San Pedro River Bridge 609)
Renovation, Infrastructure
Bidding
$10,500,000 est. value
Benson, AZ 85602

Bob Stump Memorial Parkway (51st Avenue and 43rd Avenue Interch)
New Construction, Infrastructure
Bidding
$123,000,000 est. value
Phoenix, AZ 85042

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Bridge Deck Replacement
Results
Less than $2,200,000 est. value
Nogales, AZ 85600

Broadway Road Bridges at Tempe Canal
Results
$6,000,000 est. value
Phoenix, AZ 85003

Contractor- Horse Mesa Bridge
New Construction, Infrastructure
Bidding
$700,000 to $2,000,000 est. value
Apache Junction, AZ

AZ FS 24(1) Buffalo Crossing Bridge
New Construction
Post-Bid
Duncan, AZ

Bridge Deck Replacement
Results
Less than $3,200,000 est. value
Flagstaff, AZ

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Bridge Deck Replacement and Scour Retrofit
Results
Ash Fork, AZ

Upper Pinal Creek Bridge and Roadway Alternatives
Renovation, Infrastructure
Post-Bid
Globe, AZ 85501

System Enhancement (Engineering)
Results
$3,000,000 est. value
AZ

Bridge Repair
Renovation, Infrastructure
Post-Bid
Bouse, AZ

CBP Tucson Sector Tactical Infrastructure Maintenance and Repair (CTIMR)
Renovation
Results
$750,000 est. value
Tucson, AZ

Reported 06/27/2022 05:00 PM
Project Title

Gilbert Road Bridge - CN0056 - City of Mesa

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85209   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fund the City's share of Gilbert Road bridge construction costs. A detailed scope has not been identified. This project is included in the City of Mesa's 2023-2027 Capital Improvement Plan (CIP). Information regarding engineer and architect have not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to October of 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents