Similar Projects
Puttshack - Strip District Terminal
Renovation - 23,000 SF
Conception
Pittsburgh, PA 15222

Crystal Lagoon Aquarium
New Construction
Conception
Pittsburgh, PA 15233

Pine Hall Traditional Town Development Master Plan
New Construction - 1,260,163 SF
Design
State College, PA 16801

US Department of Agriculture (USDA) Agricultural Research Service, University Park Renovation
Renovation - 31,000 SF
Design
$25,000,000 CJ est. value
State College, PA 16801

RFP D/B - Park and Recreation Building Project
New Construction, Infrastructure - 5,000 SF
Bidding
$4,500,000 CJ est. value
East Norriton, PA 19401

Arc Community Greenspace
New Construction, Infrastructure
Bidding
$398,500 CJ est. value
Meadville, PA 16335

Construction of New Facilities and the Demolition of Existing Facilities
New Construction, Demolition
Post-Bid
Carroll Valley, PA

Construction of an Outside Pavilion
Addition
Post-Bid
Tidioute, PA

Demolition of One Commercial Structure
Demolition
Results
Titusville, PA 16354

Penn Hills Park Pavilion Replacement Project
Results
Verona, PA 15147

D&L Trail Development (North Catasaqua Borough)
New Construction
Construction
$1,449,105 est. value
North Catasauqua, PA

D&L Trail Development (North Catasaqua Borough)
New Construction
Construction
$1,449,105 est. value
North Catasauqua, PA

Puttshack at The Shops at Liberty Place
Renovation
Pending Verification
Philadelphia, PA 19103

Broad & Lombard
New Construction, Infrastructure, Renovation - 598,347 SF
Pending Verification
$150,000,000 CJ est. value
Philadelphia, PA 19146

Harbor Place - Mini Golf
New Construction, Infrastructure
Conception
$250,000 est. value
Erie, PA 16507

Last Updated 08/16/2022 11:32 PM
Project Title

Community Barn Improvements to the Richland Township Community Park

Physical Address View project details and contacts
City, State (County) Bakerstown, PA 15007   (Allegheny County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

It is the intent of the Owner to enter into separate contracts as follows: Contract No. 1 General Construction Contract No. 2 HVAC Construction Contract No. 3 Plumbing Construction Contract No. 4 Electrical Construction Each bid must be accompanied by a Bid Bond, Cashier's Check, Trust Company Treasurer's Check or Certified Check made payable to Richland Township in an amount of not less than five percent (5%) of the proposal (including Base Bid and all Add Alternate Bids). Such Bid Bond or Check shall be submitted with the understanding that it shall guarantee that the Bidder's Bid will not be withdrawn for a period of at least sixty (60) days after the scheduled closing time for receipt of bids; that if the Bid is accepted, the Bidder will execute the Form of Agreement, as provided by the Owner, with all blanks appropriately filled and will submit the required 100% Performance and Labor and Material Bonds (submitted on A.I.A. Document A312) and 100% Maintenance Bond as specified in Section 007216, Article 11; and that in the event of withdrawal of said Bid within said period, or the failure to enter into said Agreement and submit said Bonds within ten days after the Bidder has received notice of the acceptance of the Bid, the Bidder shall be liable to the above mentioned Owner for the full amount of such Bond or Check as representing the damage to the Owner on account of the default of the Bidder in any particular hereof. If the Owner choses to rebid the project, the bid bond of the withdrawing bidder will be forfeited to the Owner to supplement the rebid costs. The Owner reserves the right to accept or decline the Contractor's Withdrawal of Bid Request and reserves the right to retain the bid bond.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents