Similar Projects
Forest Avenue Reconstruction
Bidding
West Bend, WI

2021 Stormwater and Street Improvements
Bidding
McFarland, WI

Itasca East 2nd Interceptor Hydrogen Sulfide Sanitary Sewer
Post-Bid
Superior, WI 54880

Fresh Coast Green Schoolyards Program: MMSD GI Service Area
Renovation
Post-Bid
Milwaukee, WI 53204

Resurface & Expand Privately Owned Vehicle Parking - MEP
Results
$340,000 est. value
Eau Claire, WI 54702

Sanitary Sewer Relay
Renovation
Results
Krakow, WI

CMP to RCP Storm Sewer Replacement
Bidding
$200,000 to $500,000 est. value
Racine, WI

McKinley Storm Water Improvements
Post-Bid
Kenosha, WI

East Park Commerce Center - Phase 1
Results
Stevens Point, WI 54481

Hillside Road Storm Structure Replacement
Bidding
Edgerton, WI 53534

Assessable Streets and Alleys
Post-Bid
$1,000,000 to $1,500,000 est. value
Racine, WI

Sanitary and Storm Relays
Results
West Allis, WI 53214

Spring and River Street Utility and Street Improvement
Bidding
Chippewa Falls, WI 54729

Storm Sewer Rehabilitation at Glenbrook Road and Laramie Ravine Outfall
Post-Bid
Bayside, WI 53217

Little Chute North Side Storm Sewer
Results
Less than $1,600,000 est. value
Little Chute, WI 54140

Last Updated 10/02/2020 02:09 PM
Project Title

Marlboro Street Storm Sewer

Physical Address View project details and contacts
City, State (County) Edgerton, WI 53534   (Rock County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installing storm sewer on Marlboro Street. a) Sawcut and remove up to 1,700 sq ft of asphalt b) Excavate and dispose of off site all spoils for a trench up to 340 feet c) Sawcut two (2) holes in existing 12” rcp large enough to accept 6” sdr26 pipe. Seal hole during pipe installation. d) Furnish and install a 6” x 4” wye at 12” rcp. e) Install up to 330’ of 6” sdr26 pipe and 330’ of 4” perf drain tile in trench. f) Sawcut and remove five (5) squares of sidewalk as determined by lateral lay out. g) Excavate and install five (5) 6” x 4” tees in main. h) Excavate and install up to 15’ of 4” sdr26 off each “t”, attempting to tunnel under existing curb and gutter. i) Backfill laterals with same soils in green areas. j) Backfill with ¾” clear rock in sidewalk area. k) Replace concrete sidewalk. l) Backfill entire trench with ¾” clear rock to bottom of existing asphalt. m) Patch Marlboro Street with same thickness asphalt to match existing asphalt and gutter.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents