Similar Projects
Pond and Drainage System Construction
Bidding
De Pere, WI

Flooding Repairs - Waisman Center
Bidding
Less than $136,000 est. value
Madison, WI

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Approach Channel Entry and Rescue Upgrades
Bidding
Milwaukee, WI

Concrete Culverts
Post-Bid
WI

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

River Bend Park Improvements
Bidding
Grafton, WI

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Lakeview Drive and Beach Drive Ditch Reconstruction Project
Bidding
Lake Ripley, WI 53523

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

Shoreline Stabilization
Results
Oconomowoc, WI 53066

Last Updated 11/20/2020 06:55 AM
Project Title

Steam Pits 14 Replacement - MEP

Physical Address View project details and contacts
City, State (County) Stevens Point, WI 54481   (Portage County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $320,000
Plans Available from State Agency - 10/13/20
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of replacement of steam pit 14 including the demolition of existing steam pit 14, the construction of new steam pit 14 and restoration of the site located at southwest corner of the intersection of Fremont Street and College Avenue. Demoliton will include removal of the existing steam pit cast in place concrete structure and portions of the cast in place concrete steam box conduits that attach on the north, south and east sides of the steam pit. Demolition will also include the removal of high pressure steam and condensate pump discharge pipe, valves, trap assemblies, expansion joints, pipe insulation and pipe supports within steam pit 14 and the connecting portions of box conduit to be removed. New construction will include a new cast in place steam pit 14 and portions of cast in place steam box conduit that were removed during demoltion. New construction will include new high pressure steam and condensate pump discharge pipe, valves, trap assemblies, expansion joints, pipe insulation and pipe supports within new steam pit 14 and the new connecting portions of box conduit to be replaced. A new sump pump with discharge pipe routed to the City storm sewer, lighting,electrical convenience receptacle will be included in the construction of new steam pit 14. Three newconduits ((1) for electric power, (1) for data, (1) for BAS) will be routed from new steam pit 14 to Nelson Hall which is located at the southeast corner of the instersection of Fremont Street and College Avenue. Eletrical power connections will be made in Nelson Hall for new steam pit 14. The data and BAS conduits are provided for future connections. The lengths of conduit routing under Fremont Street have been provided by the City’s Fremont replacement project. Surface restoration as well as replacement of a portion curb is included.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 26 - Electrical.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents