Similar Projects
Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Tower Grove Park - City of St. Louis
Infrastructure
Conception
$2,886,599 CJ est. value
Saint Louis, MO 63110

Moxy Hotel by Marriott / Saint Louis
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
Saint Louis, MO 63101

Olive West Residential
New Construction, Renovation, Infrastructure
Design
$25,000,000 CJ est. value
Saint Louis, MO 63108

Bennington Place-McKelvey Road-Ameling Road Resurfacing
Infrastructure
Bidding
$216,400 CJ est. value
Saint Louis, MO 63103

EHRM Infrastructure Upgrades Design John Cochran
Infrastructure
Bidding
$20,000,000 CJ est. value
Saint Louis, MO 63106

Badenhaus Apartments Site Improvements
Infrastructure
Post-Bid
Saint Louis, MO 63147

Phase I - Center Redevelopment Welcome and Wellness Center
Demolition, New Construction, Infrastructure - 24,100 SF
Post-Bid
$10,000,000 CJ est. value
Saint Louis, MO 63120

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

Construction of the Access Control Points in support of the National Geospatial-Intelligence Agency
New Construction, Infrastructure
Results
$711,651,970 CJ est. value
Saint Louis, MO 63107

Cervantes Convention Center Expansion and Modernization Project 1
Addition, Demolition, Renovation, Infrastructure
Construction
$123,867,709 CJ est. value
Saint Louis, MO 63101

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

The Flats at Forest Park
Demolition, New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saint Louis, MO 63108

Ponce Health Sciences University Medical School
New Construction, Infrastructure - 150,000 SF
Pending Verification
$80,000,000 CJ est. value
Saint Louis, MO 63101

O'Fallon Park - City of St. Louis
Infrastructure
Conception
$1,019,234 CJ est. value
Saint Louis, MO 63147

Last Updated 05/22/2023 12:31 PM
Project Title

Bissell Point Wastewater Treatment Facility (WWTF) Fine Screen, Concrete and Gate Improvements (SRF)

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63147   (Saint Louis City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $25,110,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done under these Contract Documents generally consists of the construction of a new building and ancillary support systems to house 5 fine ( 1/4 -inch) multi-rake bar screens each with a flow capacity of 90 million gallons per day, 10 slide gates for isolating the screen channels, 2 washer-compactors with tipping troughs for screenings loadout to dumpsters, replacement of 8 existing slide gates in the existing Gate Building, replacement of 16 existing slide gates and 4 existing butterfly gates at the existing Preaeration Tanks, expansion of MCC in Grit Building and rerouting of Detritus Tank motor power to expanded MCC, and concrete repairs at the locations of the gates being replaced

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents