Similar Projects
Downtown Taunton Traffic Signals Improvement Project
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Taunton, MA 02780

Electrical Contract Services for Maintenance and Repairs in School Buildings
Alteration
Post-Bid
Somerset, MA

Circuit E-16 Materials
Term Contract
Post-Bid
North Attleboro, MA 02760

Hathaway Water Tower Generator and HVAC Upgrades
Alteration
Results
$120,000 est. value
New Bedford, MA 02740

Community Center Generator
Alteration
Results
$116,350 est. value
North Easton, MA

Three Phase Pad-Mount Transformers
Term Contract
Post-Bid
North Attleboro, MA 02760

FHA Oxford Terrace Unit and Fire Safety Upgrades and Generator Installation - SUB Bid
Alteration
Results
$6,886,000 est. value
Fairhaven, MA

Single Phase Pad-Mount Transformers
Term Contract
Post-Bid
North Attleboro, MA 02760

FHA Oxford Terrace Unit and Fire Safety Upgrades and Generator Installation - GC Bid
Alteration
Results
$6,886,000 est. value
Fairhaven, MA

AMI Upgrade Services
Renovation
Post-Bid
$2,278,340 CJ est. value
N Dartmouth, MA 02747

Shawmut Village Exterior Electrical Panel Replacement
Alteration
Results
$260,000 est. value
New Bedford, MA 02740

25kVA and 50kVA Pole Mount Transformers
Term Contract
Post-Bid
Taunton, MA 02780

Electrical Panel Board, Switchgear and Load Center Replacement at Scattered Sites
Alteration
Results
$1,486,000 est. value
Fall River, MA 02720

On-Call Electrical Work
Term Contract
Post-Bid
$34,000 CJ est. value
New Bedford, MA 02740

Phase 2 Apartment Conversions at Cardinal Medeiros Towers Project MA 6-8 - Sub Bid
Renovation
Results
$400,750 CJ est. value
Fall River, MA 02720

Last Updated 08/28/2023 01:18 PM
Project Title

Construction of the Wading River Water Treatment Plant (WTP) Emergency PFAS Treatment Project - Sub

Physical Address View project details and contacts
City, State (County) Attleboro, MA 02703   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $41,370 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sub-bids will be required on the work described in the following Sections and/or Divisions of the contract specifications: Finishes - Division 09. Electrical - Division 16. Sub Bids are due at 1:00pm on August 16th. The Work of this Contract consists of the construction of the Wading River WTP Emergency PFAS Treatment Project including, but not limited to, clearing and grubbing, grading, site piping, propane tank, stormwater best management practices, structural foundation, prefabricated metal building, break tank, booster pumps, particulate filtration, PFAS removal treatment equipment, mechanical piping and valves, instrumentation, HVAC, and electrical systems. Electrical systems include interior lighting, power feeders to HVAC systems, site conduits and wiring, interior conduits and wiring, connections to existing electrical service panels in the existing pump station, and repairs to the existing high lift pump in the existing pump station. Questions regarding bid specs may be addressed to Matthew O'Dowd at Tata & Howard, Inc. at modowd@tataandhoward.com. The Request For Bid (RFB) is available to download from the bottom of this advertisement under Related Documents. Fill out Plan Holders Form to view and download the bid documents and to get notified of any addendums. Addendums will be emailed to the email address provided as well as posted under this advertisement. Bidders must meet the minimum experience requirements set forth in Article 3 of the Instructions to Bidders (Section 00100) in the Contract Documents. Each general bid must be accompanied by a DCAMM Certificate of Eligibility for Water and Sewerage Treatment Facilities and an Update Statement (Form CQ3) in accordance with MGL c. 149, s44D. Each filed sub-bid must be accompanied by a DCAMM Certificate of Eligibility and Update Statement (Form CQ3) for the respective trade in which the sub-bid is submitted in accordance with MGL c. 149, s44D and s44F. Each bid shall be accompanied by a bid security in the amount of 5% of the total bid amount and in the form described in the Instructions to Bidders. A Performance Bond and Labor and Materials Payment Bond each in the amount of 100 percent of the contract price will be required in the form described in the Instructions to Bidders. Complete instructions for filing bids and sub-bids are included in the Instructions to Bidders. The bidding and award of the Contract will be under the provisions of "Massachusetts General Law, Chapter 149, Sections 44A-44J (MGL c.149, ss.44A-44J). Substantially Complete the Work within 300 consecutive calendar days thereafter and to complete the Work in full (Final Completion) within 330 consecutive calendar days thereafter. Bidder further agrees to pay as liquidated damages, and not as penalty, the sum of $2,000 per day for each consecutive calendar day of delay in Substantial Completion of the Work and $2,000 per day for each consecutive calendar day of delay in the Final Completion date of the Work beyond the periods listed herein. CONTRACT NO. 007

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents