Similar Projects
Performing Arts Annex, Gymnasium & Athletic Turf Field
New Construction
Conception
$30,000,000 est. value
Chicago, IL 60618

Four Diamond Casino & Hotel Tower
New Construction - 120,800 SF
Design
$440,000,000 est. value
Hazel Crest, IL 60429

Bally's Casino
New Construction - 1,000,000 SF
Design
$1,800,000,000 est. value
Chicago, IL 60654

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

2021 School Renovations and Additions
Renovation, Addition
Results
Mount Prospect, IL 60056

Technical Services Department Renovation
Renovation
Results
Glencoe, IL

The Obama Presidential Center
New Construction - 5,000 SF
Construction
$700,000,000 to $830,000,000 est. value
Chicago, IL 60637

Six Corners Redevelopment
New Construction, Renovation - 550,703 SF
Construction
$90,000,000 est. value
Chicago, IL 60641

Movie Studio Sound Stages
New Construction, Demolition
Pending Verification
$42,900,000 est. value
Chicago, IL 60647

Prairie MS Campus and Station MS Campus
Post-Bid
Barrington, IL

2021 Renovations at Winnetka and Northfield Campus Bid Period 1
Renovation
Results
Northfield, Winnetka, IL 60093

Ice Arena Addition
Addition
Construction
Mount Prospect, IL

Welsh-Ryan Arena Court Replacement
Renovation
Post-Bid
Evanston, IL 60201

Grant Park Splash Pad
Results
Less than $257,600 est. value
Northlake, IL 60164

Last Updated 08/17/2022 09:33 AM
Project Title

Culver School Expansion - Niles School District 71

Physical Address View project details and contacts
City, State (County) Niles, IL 60714   (Cook County)
Category(s) Education, Entertainment/Recreation, Government/Public, Heavy and Highway
Sub-Category(s) Athletic Facility, Elementary School, Library - Public, Middle/Senior High School, Park/Playground, Theaters/Auditoriums
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $14,500,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This project will involve the following trade work: site work, site utilities, landscaping, concrete, masonry, steel, carpentry, roofing, doors & hardware, aluminum entrances/storefronts, glazing, casework, flooring, painting, ADA lifts, plumbing, fire protection, electrical, low-voltage/data, HVAC and temperature control work. BP 02B Building Demolition Work BP 03B Building Concrete (Cast-in-Place) Work BP 04B Masonry Work BP 05B Structural & Miscellaneous Steel Work BP 06C General Trades Work BP 06D Casework & Architectural Woodwork BP 07B Roofing Work BP 08B Aluminum Entrances, Windows, & Glazing Work BP 09F Metal Stud, Drywall, & Ceiling Work BP 09G Hard Flooring Work BP 09H Soft Flooring Work BP 09I Painting Work BP 09J Wood Flooring Work BP 14B Lift Work BP 21B Fire Protection Work BP 22B Plumbing Work BP 23B Mechanical Work BP 26B Electrical Work BP 31B Asphalt Paving & Site Concrete Work BP 32B Landscaping Work BP 33B Site Utility & Excavation Work. Bidding questions should be directed to Cheryl Janicki, Purchasing Agent, at 414/287-2649 or cjanicki@gilbaneco.com. To bid this project, bidders must be qualified by Gilbane Building Company. The prequalification application is to be completed online. Questions regarding the prequalification application procedure should be directed to Yvonda Royster at 312/614-3913 or yroyster@gilbaneco.com. The Board of Education of Niles School District 71 and Gilbane Building Company reserve the right to reject any or all bids.

Details

,, 42,000 SF - 30,000 SF. 12,000 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment, Projection Screens, Projectors, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Multiple Seating, Fixed Audience Seating, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Electronic Digital Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents