Similar Projects
Demolition of Old Police Station
Demolition, Infrastructure
Design
$12,000 CJ est. value
Lawton, OK 73501

Resurface - US 62
Infrastructure
Design
$6,700,000 CJ est. value
Cache, OK 73527

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Relocating the Proposed Community Development Block Grant Project
Infrastructure
Post-Bid
Sterling, OK

Waterline Fittings and Valves
Infrastructure
Results
Lawton, OK

ODOT Waterline Relocation
Infrastructure
Results
Geronimo, OK

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

2021 Emergency Waterline Replacement Project
Infrastructure
Post-Bid
Lawton, OK

This Project Is To Extend A Water-Main At Fletcher, Oklahoma
Term Contract
Results
Fletcher, OK 73541

Resurface - SH 49
Infrastructure
Design
$2,939,382 CJ est. value
Lawton, OK 73507

Hydrant Guard Post
Infrastructure
Post-Bid
Elgin, OK

2021 Waterline Project
Infrastructure
Results
Sterling, OK

Bridge and Approaches - SH 17
Infrastructure
Design
$1,209,600 CJ est. value
Fletcher, OK 73541

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Gore Boulevard Waterline and Sewerline Reconstruction - 82nd Street to 67th Street
Infrastructure
Results
$1,475,000 to $1,575,000 est. value
Lawton, OK

Last Updated 10/28/2022 02:04 PM
Project Title

6" Waterline Hwy 65 Between SE Bishop and SE Coombs

Physical Address View project details and contacts
City, State (County) Lawton, OK 73501   (Comanche County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Each Proposal shall be accompanied by an acceptable form of Proposal Guaranty in an amount equal to at least 5% of the amount of the Proposal payable to Comanche County Rural Water District #3 as a guaranty that if the Proposal is accepted, the BIDDER will execute the Contract and file acceptable Performance and Statutory Bonds within 10 days after the award of the Contract. Comanche County Rural Water District #3 hereinafter called the OWNER, reserves the right to reject any or all Proposals and to waive any formality or technicality in any Proposal in the interest of the OWNER. Liquidated damages for failure to complete the work within the time specified shall be assessed at the rate of $250 per day for each additional calendar day until the work is completed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents