Similar Projects
7-Eleven at Pine Oaks
New Construction - 3,500 SF
Conception
$500,000 to $1,000,000 CJ est. value
Eustis, FL

Christian Brothers Automotive
New Construction - 6,054 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Mount Dora, FL

The Vue at Clermont
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Clermont, FL 34711

Villa Pass
New Construction
Design
Mascotte, FL

County Road 452 From County Road 44 to Lake / Marion County Line
Infrastructure
Bidding
$2,432,976 CJ est. value
Eustis, FL 32726

Remodel and Addition of Fire Station 91
Addition, Demolition, Build-out, Infrastructure
Bidding
$300,000 CJ est. value
Mascotte, FL 34753

RFQ - Engineers for Astatula Fuel Remediation System Operation and Maintenance (O&M)
Term Contract
Post-Bid
Astatula, FL 34705

RFQ - Engineers for Astatula Fuel Remediation System Operation and Maintenance (O&M)
Term Contract
Post-Bid
Astatula, FL 34705

Lake May Reserve - Site 1 Improvements
Results
Eustis, FL 32736

Lake Denham Muck Farm Restoration
Infrastructure
Results
Leesburg, FL 34748

Carmax Superstore #6136
New Construction - 53,466 SF
Construction
$3,000,000 est. value
Clermont, FL 34711

Panda Express - Sitework
New Construction
Construction
$2,266,630 est. value
Mount Dora, FL 32757

Turnpike Logistics Center
New Construction, Infrastructure - 977,000 SF
Pending Verification
$63,500,000 CJ est. value
Groveland, FL 34736

Fire Station No. 34 - City of Mount Dora
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Mount Dora, FL 32757

Take 5 Oil Change
New Construction - 1,438 SF
Conception
Less than $500,000 CJ est. value
Clermont, FL 34714

Last Updated 09/16/2022 04:32 PM
Project Title

Hyundai of Central Florida - Hyundai Genesis Dealership and Hyundai Service Expansion

Physical Address View project details and contacts
City, State (County) Clermont, FL 34711   (Lake County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,130,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

**A general contractor has been awarded. All trades have been let. The project is the construction of a ground-up 18,500 SF Hyundai Genesis New Car Showroom and a 13,000 SF expansion to an existing Hyundai Service Department. The projects are adjacent to each other. The work scope includes: Sitework, Asphalt, Utilities, Landscape & Irrigation, Permanent and Temporary Chain-Link Fencing, Exterior Pavers, Interior Pavers, Site Concrete, Reinforced Concrete, Polished Concrete, Sealed Concrete, Stamped Concrete, CMU, Structural Steel, Misc. Steel, Metal Roof Screens, Rough Carpentry, Millwork, Solid Surface Tops, Laminate Tops, Roofing, Skylights, Insulation, Caulking & Waterproofing, ACM (MCM), EIFS, Doors & Hardware, Overhead Doors, Overhead Doors (High-Speed, Coiling Steel, and Hurricane Shutters), Automatic Sliding Doors, Storefront & Curtainwall, Framing & Drywall, T-Bar Metal Mesh ceilings, ACT, Aluminum Canopy, Painting, Tile Flooring, Carpet, Motorized Window Shades, Welded Wire Partition panel, Vinyl Window Film, NANA Wall Glass Partition, Bath Accessories, Toilet Partitions, Fire Extinguishers, Fire Suppression, Plumbing, HVAC, Electrical, Fire Alarm. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

18,500 SF - 18,500 SF. 13,000 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents