Similar Projects
Dock Replacement, Lake of the Ozarks State Park, Camp Rising Sun
Term Contract
Post-Bid
Kaiser, MO 65047

Flotation and Dock Replacement
Infrastructure
Post-Bid
Kansas City, MO 64134

Floatation and Dock Replacement
Infrastructure
Post-Bid
Kansas City, MO 64064

Flotation and Dock Replacement
Infrastructure
Post-Bid
Kansas City, MO 64134

Steamboat Landing
Infrastructure
Post-Bid
Warsaw, MO

Flatwoods Park Boat Ramp Construction and Development
Infrastructure
Results
O'Fallon, MO 63366

Repair Parking Lot and Loading Dock Infrastructure
Infrastructure
Results
Rolla, MO 65401

Cranberry Chute Repair
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Malta Bend, MO

Pre-Engineered Plans and Materials for a Floating Fishing Dock at Norma Sutherland Smith Park
Term Contract
Post-Bid
Columbia, MO 65202

Reported 03/12/2022 12:00 AM
Project Title

Pre-Engineered Plans and Materials for a Floating Fishing Dock, Walkway and Stiff Arm at Vineyards Lake Park

Physical Address View project details and contacts
City, State (County) Columbia, MO 79029   (Boone County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design, materials, delivery and final plan sheet for a floating fishing dock, walkway and stiff-arm at Vineyards Lake Park 1701 dumas drive columbia Mo 65201

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents