Similar Projects
Bldg 503 Replace Variable Refrigerant Flow (VRF)
Design
$250,000 to $500,000 est. value
Dover, DE 199025639

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

HVAC Insulation BPA
Post-Bid
Dover, DE 19902

HVAC Upgrade and Roof Replacement at Delaware State Police Firing Range
Results
Less than $5,000,000 est. value
Smyrna, DE

William Penn Building - Cooling Tower Replacement
Results
Dover, DE

Replacement of HVAC Equipment
Post-Bid
Dover, DE 19901

Repair, Inspection and Preventative Maintenance of Air Compressors and Fluid Handling Systems - Statewide
Results
Less than $22,436 est. value

Parts, Consultation for Repairs to HVAC Equipment
Post-Bid
Dover, DE

Replace Existing Variable Refrigerant Flow (VRF) with HVAC at Bldg. 503
Results
$250,000 to $500,000 est. value
Dover, DE 199025639

Replace Automated Temperature Controls B116
Post-Bid
Dover AFB, DE

Tatnall Building – Heat Pump Replacement
Results
Dover, DE 19901

Repair Bldg 502 HVAC, Elevator, and Roof
Post-Bid
$500,000 to $1,000,000 est. value
Dover AFB, DE

Legislative Hall – Core Building HVAC Replacement
Results
Dover, DE 19901

Young Correctional Institution – AHU Replacement – Phase 2
Results
Dover, DE 19901

Baylor Women’s Correctional Institution – AHU No. 5 Replacement
Results
Dover, DE 19901

Last Updated 03/05/2019 09:15 AM
Project Title

Caesar Rodney School District - Charlton School HVAC Renovations

Physical Address View project details and contacts
City, State (County) Camden Wyoming, DE   (Kent County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Project consists of the alteration of the following: 1. Existing RTUs will be removed and replaced in kind. 2. Existing VAV units will be removed and replaced in kind. 3. Associated work will include repair of roof surfaces, removal and replacement of ceiling tile and grid, reinforceing of existing roof framing.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents