Similar Projects
Vision Zero Rapid Response – Installation and Removal of Traffic Warning Devices (Sheltered Market Solicitation)
Bidding
Tampa, FL 33602

Advanced Traffic Management System (ATMS)
Post-Bid
Tampa, FL 33601

Traffic Control Devices and Related Products
Post-Bid
Less than $180,000 est. value
Tampa, FL 33601

Red Light Traffic Infraction Detection Program
Results
Tampa, FL

Accelerated Weathering of Traffic Control Materials
Term Contract
Results

Traffic Signal Update
Results
Less than $2,050,000 est. value
FL

Traffic Monitoring Site (TMS) Installation and Maintenance Services
Results

Signal Components Cable, Wire, Conduit and Associated Parts
Results
Less than $360,000 est. value
FL

District 1 and 7 Materials and Research Maintenance of Traffic
Results
Less than $370,000 est. value

Traffic Signal and Roadway Lighting Services
Results
Less than $4,251,417 est. value
Tampa, FL 33601

Traffic Signal Information Technology Services (ITS)
Results
Less than $440,513 est. value
Tampa, FL 33601

Traffic Loop Detection Services
Results
Less than $464,859 est. value
Tampa, FL 33601

Power Outage Emergency Beacon Installation
Results
Less than $3,165,190 est. value
Tampa, FL 33601

Rental of Traffic Control Devices
Results
Tampa, FL 33602

Traffic Signal Updates
Results
Less than $700,000 est. value
FL

Last Updated 05/20/2019 04:16 PM
Project Title

Intelligent Transportation System (ITS) on I-75 from Big Bend Road to Progress Boulevard, Hillsborough County

Physical Address View project details and contacts
City, State (County) FL   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Project includes ITS Freeway Installation/Development on I-75 from south of Big Bend Road to south of Progress Boulevard. The Project length is approximately 8.0 miles. This Project will be a portion of Tampa Bay SunGuideTM. The Design-Build Firm shall design and prepare a complete set of construction plans, specifications package, and technical special provisions for the infrastructure included in the Project.
Details
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents