Similar Projects
Reported | 02/17/2021 12:00 AM |
Project Title | On-Demand Engineering Services |
Physical Address | View project details and contacts |
City, State (County) | Forest Park, Jonesboro, Lake City, Lovejoy, Morrow, Riverdale, GA (Clayton County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The CCWA currently serves as the water, sewer and stormwater utility for Clayton County and the Cities of Forest Park, Lake City, Morrow, Jonesboro, Riverdale, and Lovejoy. The service area represents a population of approximately 290,000 residents and includes over 85,000 active customer accounts. The CCWA’s major facilities include five water supply reservoirs, three water production plants (with a combined capacity of 42 million gallons per day [MGD]), ground and elevated storage tanks and booster pump systems, three advanced treatment water reclamation facilities (with a combined capacity of 38.4 MGD), engineered constructed wetlands treatment and almost 3000 miles of water distribution and wastewater collection pipelines. Stormwater utility operations manage approximately 40,000 structures and almost 500 miles of conveyance infrastructure. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |