Similar Projects
Residences At The Assonet Inn
New Construction
Conception
Freetown, MA

Pike Estates
New Construction
Conception
Attleboro, MA 02703

Friend Street Subdivision
New Construction
Design
Freetown, MA 02702

Highland Farms 2
New Construction
Design
Fall River, MA 02720

Disposition of Municipal Property for the Development of Affordable Housing
Results
Westport, MA

Building Envelope Upgrades & Boiler, DHW and Toilet Replacement - General Bid
Renovation
Results
$817,328 est. value
Taunton, MA

Fuller Estates
New Construction
Construction
Taunton, MA 02780

Fisher Estates
New Construction
Construction
Somerset, MA 02726

Perry Estates
New Construction
Pending Verification
Taunton, MA

Brian's Way
New Construction
Pending Verification
Taunton, MA 02780

Locust Acres
New Construction
Conception
Freetown, MA 02702

Stone Field Estates 3
New Construction
Design
Attleboro, MA 02703

Bathroom Repairs and Site Re-Grading
Renovation
Results
Less than $53,800 est. value
Swansea, MA 02777

Greystone Estates
New Construction
Construction
Raynham, MA

Friend Street Subdivision
New Construction
Pending Verification
Freetown, MA 02702

Last Updated 01/07/2022 09:14 AM
Project Title

Unit 111 and 14 Renovations

Physical Address View project details and contacts
City, State (County) Taunton, MA 02780   (Bristol County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $65,380
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of the Contract consists of: 1. Demolition of remaining components and fixtures. 2. New partition framing, subfloor and underlayment. 3. New Concrete floor infill. 4. New rough plumbing, new exhaust fan and rough electric. 5. New drywall and tile board. 6. New casework, plumbing fixtures and electrical fixtures. 7. New flooring and painting. 8. New toilet accessories. 9. New Residential Kitchen Appliances. 10. Work either shown on the Drawings or included in the specifications unless Specifically indicated not to be done. 11. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 12. Providing and restoring, where appropriate, all temporary facilities.

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents