Similar Projects
Direct Connection Drive Sewers
Bidding
Fort Oglethorpe, GA

Extension, Renewal, Replacement and Repair of Water Lines (3/4"-24" Diameter), Sanitary Sewer (4"-24" Diameter) and Storm Sewer (12"-60" Diameter)
Infrastructure
Bidding
Winder, GA

Subcontractors Sewer Rehab Work
Post-Bid
Sandersville, GA 31082

SR-144 and I-95 Water and Sewer Relocations
Post-Bid
Richmond Hill, GA 31324

Disaster Recovery and Sewage Cleaning Services
Term Contract
Results
GA

Manget Street at Lakewood Drive Water and Sanitary Sewer Relocation
Results
Less than $357,198 est. value
Marietta, GA 30060

Connally Vault Sewer Capacity Relief Project
Infrastructure
Bidding
Atlanta, GA

Sanitary Sewer Flow Monitoring and Maintenance Services on an Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA 30042

Prosperity Drive Water and Sewer Improvements
Results
Garden City, GA 31418

8 Inch Sanitary Sewer Relocation
Alteration
Bidding
Macon, GA 31204

Utility Extension to Serve Peach County High School
Post-Bid
Fort Valley, GA

2020 Sewer Rehabilitation Project
Results
Dalton, GA

Alleyway Gravity Sewer Lines
Infrastructure
Bidding
Social Circle, GA

Grease Trap and Septic Service
Post-Bid
Gainesville, GA 30504

Fairground Street Area Roswell Street to Fraiser Street Water and Sanitary Sewer Relocation
Results
Less than $1,772,701 est. value
Marietta, GA 30060

Last Updated 08/04/2021 08:13 AM
Project Title

Brookwood Drive Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Dalton, GA 30720   (Whitfield County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $248,790
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The site is +/- 0.45 acres and is a residential lot owned by the City of Dalton at 915 Brookwood Drive. The existing structure on the site will be demolished by the Owner prior to the start of work. The Contractor will be responsible for the excavation of a pond to provide additional flood storage for the backwater of Tar Creek. Approximately 0.51 acres will be disturbed during construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents