Similar Projects
2023 Bond - Elgin School District U46
Demolition, New Construction, Renovation, Infrastructure
Conception
$179,000,000 CJ est. value
Elgin, IL 60120

2023 Bond - Elgin School District U46
Demolition, New Construction, Renovation, Infrastructure
Conception
$179,000,000 CJ est. value
Elgin, IL 60120

Aurora Central Catholic High School STEM Building
New Construction, Infrastructure
Design
$4,500,000 CJ est. value
Aurora, IL 60506

Hough Street ES and Sunny Hill ES
Renovation
Post-Bid
Barrington, Carpentersville, IL 60010

2022 Summer School Improvements
Renovation
Post-Bid
Algonquin, Carpentersville, IL 60110

2022 BHS Stadium Improvements
Renovation
Results
Batavia, IL 60510

Concrete - Various Sites District Wide Plus Alternative Work
Alteration
Results
Algonquin, Carpentersville, IL 60102

Mooseheart Activity Center
Addition
Construction
Mooseheart, IL 60539

Resilience Education Center - Phase 2
Renovation - 31,218 SF
Construction
$5,000,000 CJ est. value
Aurora, IL 60505

2023 Bond - Kaneland School District 302
Addition, Demolition, Renovation, Infrastructure
Conception
$57,500,000 CJ est. value
Maple Park, IL 60151

Cafeteria Expansions
Addition
Post-Bid
Elgin, IL 60124

Boiler Replacement at Multiple Schools
Alteration
Results
$35,000 to $45,000 est. value
Bartlett, Elgin, Streamwood, Wayne, IL 60120

PRESS - Geneva High School - Lighting/Controls upgrade - Geneva Community Unit School District No. 304
Renovation
Conception
$556,500 CJ est. value
Geneva, IL 60134

2022 Window Replacements
Alteration
Post-Bid
Aurora, IL 60505

2022 Roof Renovations
Alteration
Results
Geneva, IL 60134

Last Updated 04/25/2023 11:03 AM
Project Title

2023 Multi-Site Boiler Replacement

Physical Address View project details and contacts
City, State (County) St Charles, IL 60174   (Kane County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,884,516 [brand] Estimate
Plans Available from Copy Center - 03/30/23
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes: boiler plant replacement including all associated architectural, mechanical, and electrical work at three building sites The Owner requires Substantial Completion of the project on or before October 6, 2023. Bids may not be withdrawn within sixty (60) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding The successful bidder is required to pay the general prevailing wage for work as ascertained by the Illinois Department of Labor, and shall submit certified payroll records, in compliance with the Prevailing Wage Act (820 ILCS 130) and shall comply with all applicable Illinois statutory requirements regarding labor, including Equal Employment Opportunity laws. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to St. Charles Community Unit School District 303 in an amount equal to ten percent (10%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond Bids may not be withdrawn within sixty (60) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. Base Bid 1 - East High School -Premier Mechanical, Inc. -$618,000.00 Base Bid 2 - North High School & Wredling Middle School -Cyril Regan Heating -$1,318,500.00 Base Bid 3 - Combined East HS, North HS, & Wredling MS -Cyril Regan Heating -$1,948,016.00

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents