Similar Projects
Oslo Levee Repair
Design
$25,000 to $10,000 est. value
Oslo, MN

NLH Pond Kettle Repair
Post-Bid
New London, MN 56273

Directional Boring
New Construction
Post-Bid
Minneapolis, MN 55401

2020 Northeast Drainage Area Improvements
Results
$1,500,000 est. value
Lino Lakes, MN 55104

2020 Pond Maintenance
Results
Golden Valley, MN 55427

Bluff 25 Culvert Replacement
Post-Bid
Eden Prairie, MN

2020 Pond Cleaning
Renovation
Results
$110,000 est. value
West Saint Paul, MN 55118

DNR1 Eckvoll WMA Culvert Installation
Post-Bid
Gatzke, MN 56724

CSAH 34 Reconstruction
Results
Fergus Falls, MN 56537

Butler Road - Culvert Replacement
Post-Bid
MN

Culvert Replacement with Culvert, Minor Approach Grading and Aggregate Surfacing
Results
$120,189 est. value
MN

Sakatah Singing Hills State Trail Lime Valley Slope Failure
Post-Bid
Less than $356,970 est. value
Mankato, MN

Centerline Culvert Replacement with Culvert, Approach Grading, Aggregate Base, Bituminous Paving, Aggregate Shouldering and Striping
Results
$296,335 est. value
MN

Replacement of all Culverts, Full-Depth Reclamation, and Paving
Post-Bid
Baudette, MN

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

Last Updated 07/06/2021 06:05 AM
Project Title

Gitchi Gami State Trail Tofte South Segment

Physical Address View project details and contacts
City, State (County) Tofte, MN   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of constructing a 10-foot wide bituminous shared use path for approximately 3,200 LF along the southbound travel lane of TH 61. Americans with Disabilities Act (ADA) compliant pedestrian crossings will be constructed as part of this project. This project will also require embankment construction throughout the project corridor with spot locations of excavation for topsoil salvaging and storm sewer installation. New culverts will be installed at all entrances within project limits. Other project work includes concrete curb & gutter, concrete aprons at entrances, turf establishment, placement of riprap, pavement marking, and trail/roadway signage.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents