Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Wastewater Pump Station Improvements
Design
North Bay Village, FL

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Lanark East Lift Station
Results
Carrabelle, FL

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Lift Station, Grease Trap and Septic Tank Pump and Maintenance
Term Contract
Results
Less than $300,000 est. value
Viera, FL 32940

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Lift Station #17 Rehabilitation
Results
Less than $350,000 est. value
Maitland, FL 32751

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Cooper Creek Lift Station Relocation
Renovation
Post-Bid
$1,200,000 est. value
University Park, FL 34201

Last Updated 07/08/2021 03:12 AM
Project Title

Southwest - Timuquana PS Upgrade Project

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32210   (Duval County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work to be performed under this Contact consists of the rehabilitation and repair of the Timuquana Road Class III/IV Pump Station Upgrades project, which generally includes the following: 1. Replacement of three (3) existing pumps with new pumps and Variable Frequency Drive (VFD)s units. 2. Replace exterior doors and doorframes. 3. Replace existing ventilation systems with a new ventilation system. 4. Replace existing internal and external lighting systems with new LED lighting systems. 5. Replace existing potable water system with a new potable water system. 6. Replace all plumbing including plumbing fixtures. 7. Replace existing electrical powering system with a new system, including grounding and emergency power system (i.e. generator, ATS, fuel tanks (if needed), etc.). 8. Remove existing mechanical bar screen and design a FRP grating/cover system to seal openings. 9. Recoat all piping, equipment and structures per JEA Standard Section 411 and AS-502. 10. Assess the structural integrity of the existing pump station superstructure. Rehab the superstructure (Motor Room, Screen Room, Generator Room, Pump Room, Wet Well, Influent Chamber) and all its accessories (i.e. stairways, fall protection, covers, grating, etc.) as required.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents