Similar Projects
Api 653 Tank Inspection - Shaw Afb
Bidding
Shaw Air Force Base, SC

Provide and Install Two New Fiberglass Sewer Tanks and Grinding Pumps at Charleston County K-9 Facility
Post-Bid
North Charleston, SC 29405

Thurmond Gazes Research Building Deaerator Tank Replacement
Post-Bid
$700,000 to $750,000 est. value
Charleston, SC 29425

J--Fuel Tank Tightness Testing
Results
Charleston, SC 29401

5500 Gal. Captor Containment Systems
Results

Diesel Fuel Tank Cleaning
Term Contract
Post-Bid
Charleston, SC 29425

B1955 Install Natural Gas Line
Results
Less than $25,000 est. value
Shaw Air Force Base, SC 29152

Installation of an Emergency Stop Panel
Post-Bid
Charleston, SC

MYR General Aviation (GA) Fuel Farm Improvements (Construction)
Results
Myrtle Beach, SC 29577

North Tower Gas Line Replacement
Post-Bid
$25,000 to $30,000 est. value
Columbia, SC 29201

UST Corrective Action at Site #01589, Circle K 2720886
Results
Less than $1,646,000 est. value
Ravenel, SC 29470

Schwartz WWTP Polymer Bulk Tank
Post-Bid
Myrtle Beach, SC 29588

Gas Service Lines Installation
Results
Greenville, SC

Brine Tank Addition
Addition
Post-Bid
$80,000 est. value
Greenwood, SC 29649

Rental Car Fuel Facilities Tank Replacement Project
Results
West Columbia, SC 29170

Reported 12/10/2019 12:00 AM
Project Title

Fuel Tank and Pump Removal and Installation Project

Physical Address View project details and contacts
City, State (County) Jackson, SC 29831 (Aiken, Allendale, Bamberg, Barnwell, Calhoun, Edgefield, McCormick, Orangeburg, Saluda Counties)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

D landfill and provides solid waste management services for the counties of Aiken, Allendale, Bamberg, Barnwell, Calhoun, Edgefield, McCormick, Orangeburg, and Saluda, South Carolina Furnish and install two (2) new above ground fuel tanks and pumping systems, along with the removal and disposal of our existing three (3) above ground fuel tanks. The Project shall also include the full integration of existing FuelMaster fuel management system into the new tank and pumping system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents